Current methods of measuring acquisition project performance are based upon generations of old cost models that compare budgets with expenditures. These methods provide little in the way of forecasting, leaving the project manager to react to past performance rather than making decisions of future potential. The principal means of measuring project performance in large complex projects is earned value management (EVM), which measures actual work performed to budgeted work performed. While this method provides valuable insight into how well a project is doing relative to a predetermined plan, new methods of forecasting when projects begin to become volatile are needed. Knowing when a project will enter a phase of volatility will provide grea...
Abstract: Earned Value Management (EVM) methods for forecasting project duration have been taught in...
He identified several serious challenges associated with conventional EVM.and addressed the first is...
Thesis (S.M. in System Design and Management)--Massachusetts Institute of Technology, Engineering Sy...
Current methods of measuring acquisition project performance are based upon generations of old cost ...
The primary objective of this research was to demonstrate how Earned Value Management (EVM) principl...
A Thesis submitted in partial fulfillment of the requirements for the Degree of Master of CommerceTh...
As a risk control tool, earned value analysis is crucial for identifying risky trends in the budget ...
AbstractEarned value project management is a well-known management system that integrates cost, sche...
The Earned Value Management System (EVMS) is a useful management tool available for project manager...
Purpose: The purpose of this paper is to describe a Doctor of Project Management research study incl...
This paper presents a review of an Earned Value Management System (EVM) for assessing project perfor...
Excerpt from the Proceedings of the Nineteenth Annual Acquisition Research SymposiumThe Department o...
Thesis (S.M.)--Massachusetts Institute of Technology, System Design and Management Program, 2009.Inc...
The objective of this study was to determine the usefulness of Earned Value Management as a program ...
Thesis: S.M. in Engineering and Management, Massachusetts Institute of Technology, System Design and...
Abstract: Earned Value Management (EVM) methods for forecasting project duration have been taught in...
He identified several serious challenges associated with conventional EVM.and addressed the first is...
Thesis (S.M. in System Design and Management)--Massachusetts Institute of Technology, Engineering Sy...
Current methods of measuring acquisition project performance are based upon generations of old cost ...
The primary objective of this research was to demonstrate how Earned Value Management (EVM) principl...
A Thesis submitted in partial fulfillment of the requirements for the Degree of Master of CommerceTh...
As a risk control tool, earned value analysis is crucial for identifying risky trends in the budget ...
AbstractEarned value project management is a well-known management system that integrates cost, sche...
The Earned Value Management System (EVMS) is a useful management tool available for project manager...
Purpose: The purpose of this paper is to describe a Doctor of Project Management research study incl...
This paper presents a review of an Earned Value Management System (EVM) for assessing project perfor...
Excerpt from the Proceedings of the Nineteenth Annual Acquisition Research SymposiumThe Department o...
Thesis (S.M.)--Massachusetts Institute of Technology, System Design and Management Program, 2009.Inc...
The objective of this study was to determine the usefulness of Earned Value Management as a program ...
Thesis: S.M. in Engineering and Management, Massachusetts Institute of Technology, System Design and...
Abstract: Earned Value Management (EVM) methods for forecasting project duration have been taught in...
He identified several serious challenges associated with conventional EVM.and addressed the first is...
Thesis (S.M. in System Design and Management)--Massachusetts Institute of Technology, Engineering Sy...