This report analyzed several different aspects of the fire protection and life safety strategy for the Tritium Engineering Building (TEB) at the Savannah River Site in Aiken, SC. The TEB is a single-story, Type IIB building that primarily houses engineering and technical staff. The building is approximately 15,560 ft2 and consists of two large “open areas” enclosed by hard- wall offices. Modular workstations are located in both “open areas” and accommodate the majority of the building occupants. This analysis provided both a prescriptive and a performance-based approach for analyzing fire hazards within the building. The prescriptive- based analysis evaluated the building for compliance with nationally recognized codes and standards. The pe...
This project report is a fire and life safety evaluation of a newly constructed building. The new Ca...
This project report is a fire and life safety evaluation of a newly constructed building. The new Ca...
This fire and life safety analysis was performed on the Grant M. Brown Engineering Building in order...
This Fire Protection Engineering analysis was performed on Building 910 in Sandia National Laborator...
A Fire Protection Engineering Analysis was performed on TA‐3‐0040, Physics Building at the Los Alamo...
This Fire Protection Engineering analysis was performed on Building 910 in Sandia National Laborator...
This Fire Protection Engineering analysis was performed on Building 910 in Sandia National Laborator...
This report includes a fire protection and life safety analysis of the South Texas Project Turbine G...
This report analyzes the fire protection and life safety systems of the Christopher Cohan Center. Th...
A detailed study of the fire and life safety systems was performed on the Powell Building located in...
This FPE 596 culminating project report was developed to meet the requirements for completion of the...
The building in XXX was constructed in XXX. It was designed using the International Building Code (I...
This document is a Fire and Life Safety Report on the Taylor Place Dormitory located in Phoenix, Ar...
In partial fulfillment of the requirements for the Degree of Masters of Science in Fire Protection...
In partial fulfillment of the requirements for the Degree of Masters of Science in Fire Protection...
This project report is a fire and life safety evaluation of a newly constructed building. The new Ca...
This project report is a fire and life safety evaluation of a newly constructed building. The new Ca...
This fire and life safety analysis was performed on the Grant M. Brown Engineering Building in order...
This Fire Protection Engineering analysis was performed on Building 910 in Sandia National Laborator...
A Fire Protection Engineering Analysis was performed on TA‐3‐0040, Physics Building at the Los Alamo...
This Fire Protection Engineering analysis was performed on Building 910 in Sandia National Laborator...
This Fire Protection Engineering analysis was performed on Building 910 in Sandia National Laborator...
This report includes a fire protection and life safety analysis of the South Texas Project Turbine G...
This report analyzes the fire protection and life safety systems of the Christopher Cohan Center. Th...
A detailed study of the fire and life safety systems was performed on the Powell Building located in...
This FPE 596 culminating project report was developed to meet the requirements for completion of the...
The building in XXX was constructed in XXX. It was designed using the International Building Code (I...
This document is a Fire and Life Safety Report on the Taylor Place Dormitory located in Phoenix, Ar...
In partial fulfillment of the requirements for the Degree of Masters of Science in Fire Protection...
In partial fulfillment of the requirements for the Degree of Masters of Science in Fire Protection...
This project report is a fire and life safety evaluation of a newly constructed building. The new Ca...
This project report is a fire and life safety evaluation of a newly constructed building. The new Ca...
This fire and life safety analysis was performed on the Grant M. Brown Engineering Building in order...