A U.S. Department of Energy project to convert excess weapons-grade plutonium into fuel for commercial nuclear reactors to fulfill an international agreement with Russia is billions over budget and well over a decade behind schedule. This in and of itself is a problem, but the larger problem is that failure to complete the project endangers worldwide nonproliferation and disarmament efforts and leaves one of the biggest stockpiles of weapons-grade plutonium unaddressed. This decision memo reviews several technical reports that have been conducted and recommends pursuing a new strategy to renegotiate the agreement with Russia to allow for the dilution and disposal of the excess plutonium at the Waste Isolation Pilot Plant in New Mexico
A letter report issued by the Government Accountability Office with an abstract that begins "The end...
This book emerged from a “Policy Research Project” (PRP) at the LBJ School of Public Affairs, Univer...
Due to the character of the original source materials and the nature of batch digitization, quality ...
Thesis (Ph. D.)--Massachusetts Institute of Technology, Dept. of Nuclear Engineering, 1997.Includes ...
With the end of the Cold War and the implementation of various nuclear arms reduction agreements, US...
The amount of plutonium discarded as wastes from the U.S. nuclear weapons complex appears to be sign...
The United States (U.S.) has identified 61.5 metric tons (MT) of plutonium that is permanently exces...
The end of the Cold War has created a legacy of surplus fissile materials (plutonium and highly enri...
The American Nuclear Society (ANS) endorses the rapid application of mixed uranium plutonium oxide (...
The end of the cold war and the resulting dismantlement of nuclear weapons has resulted in the need ...
The U.S. and Russian weapons dismantlement process is producing hundreds of tons of excess plutonium...
Following the end of the Cold War, the United States identified 61.5 metric tons (MT) of plutonium a...
In 1997, DOE issued a ROD endorsing a “dual-track ” approach for dispositioning excess Pu so that it...
Thesis (M.S.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 1994.Includes...
The goals for plutonium management have changed dramatically over the past few years. Today, the cha...
A letter report issued by the Government Accountability Office with an abstract that begins "The end...
This book emerged from a “Policy Research Project” (PRP) at the LBJ School of Public Affairs, Univer...
Due to the character of the original source materials and the nature of batch digitization, quality ...
Thesis (Ph. D.)--Massachusetts Institute of Technology, Dept. of Nuclear Engineering, 1997.Includes ...
With the end of the Cold War and the implementation of various nuclear arms reduction agreements, US...
The amount of plutonium discarded as wastes from the U.S. nuclear weapons complex appears to be sign...
The United States (U.S.) has identified 61.5 metric tons (MT) of plutonium that is permanently exces...
The end of the Cold War has created a legacy of surplus fissile materials (plutonium and highly enri...
The American Nuclear Society (ANS) endorses the rapid application of mixed uranium plutonium oxide (...
The end of the cold war and the resulting dismantlement of nuclear weapons has resulted in the need ...
The U.S. and Russian weapons dismantlement process is producing hundreds of tons of excess plutonium...
Following the end of the Cold War, the United States identified 61.5 metric tons (MT) of plutonium a...
In 1997, DOE issued a ROD endorsing a “dual-track ” approach for dispositioning excess Pu so that it...
Thesis (M.S.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 1994.Includes...
The goals for plutonium management have changed dramatically over the past few years. Today, the cha...
A letter report issued by the Government Accountability Office with an abstract that begins "The end...
This book emerged from a “Policy Research Project” (PRP) at the LBJ School of Public Affairs, Univer...
Due to the character of the original source materials and the nature of batch digitization, quality ...