For drilling operation in the deepwater, dynamic positioning system is used for platform to main the position. In case drift off (positioning system don t function), the drilling system might be damaged before an emergency disconnection can be performed. The time window between the beginning of the drift off and critical riser damage depends on the many facors. The purpose of the thesis is to identify the influence of coupling effects between the riser and platform on the time windown and identify a reliable model for this type of analysis. The dynamic nonlinear analysis is carried out in Sima for both coupled and uncoupled conditions. The critical scenario is defined that wind, current, and wave acting in the same direction. 300 m, 1000 m...
Master's thesis in Offshore technologyThe hostile environments are presently one of the challenges t...
Master's thesis in Offshore technologyThe hostile environments are presently one of the challenges t...
Abstract: Offset of a dynamically positioned drilling vessel from the setpoint location above the we...
For drilling operation in the deepwater, dynamic positioning system is used for platform to main the...
The drift-off dynamic model of deepwater drilling platform and riser coupling system was established...
The object of this master thesis is to investigate a drilling riser exposed to currents, waves and v...
The object of this master thesis is to investigate a drilling riser exposed to currents, waves and v...
This paper presents a methodology in order to perform a drift off calculation for drillships accordi...
The oil industry is expanding its activities into deeper and deeper waters. This creates new challen...
This paper presents a methodology in order to perform a drift off calculation for drillships accordi...
This paper presents a methodology in order to perform a drift off calculation for drillships accordi...
A mathematical model of a drillstring-riser system is developed to analyze the system dynamics when ...
The landing string is an important component of deepwater riserless drilling systems. Determination ...
For the drilling of petroleum wells in deep and ultra deep, the use of floating platforms such as se...
for advanced riser analysis. Deep water oil recovery have forced a change in thesystems used to tens...
Master's thesis in Offshore technologyThe hostile environments are presently one of the challenges t...
Master's thesis in Offshore technologyThe hostile environments are presently one of the challenges t...
Abstract: Offset of a dynamically positioned drilling vessel from the setpoint location above the we...
For drilling operation in the deepwater, dynamic positioning system is used for platform to main the...
The drift-off dynamic model of deepwater drilling platform and riser coupling system was established...
The object of this master thesis is to investigate a drilling riser exposed to currents, waves and v...
The object of this master thesis is to investigate a drilling riser exposed to currents, waves and v...
This paper presents a methodology in order to perform a drift off calculation for drillships accordi...
The oil industry is expanding its activities into deeper and deeper waters. This creates new challen...
This paper presents a methodology in order to perform a drift off calculation for drillships accordi...
This paper presents a methodology in order to perform a drift off calculation for drillships accordi...
A mathematical model of a drillstring-riser system is developed to analyze the system dynamics when ...
The landing string is an important component of deepwater riserless drilling systems. Determination ...
For the drilling of petroleum wells in deep and ultra deep, the use of floating platforms such as se...
for advanced riser analysis. Deep water oil recovery have forced a change in thesystems used to tens...
Master's thesis in Offshore technologyThe hostile environments are presently one of the challenges t...
Master's thesis in Offshore technologyThe hostile environments are presently one of the challenges t...
Abstract: Offset of a dynamically positioned drilling vessel from the setpoint location above the we...