The new headrace tunnel at the water power station at Røssåga will be constructed with TBM and the project will thereby have Norway´s first TBM-tunnel since 1993. The tunnel is located in Nordland with a lot of calcareous rock types and the risk of encountering karst and water inflow is therefore present. It has therefore been performed an engineering geological evaluation of the possible water problems in the headrace tunnel. The analysis is based on a review of the possibility of meeting karst in the tunnel, review and discussion of experiences with former tunnel projects in karst areas for both international projects and projects from Nordland, and a review of the engineering geological conditions at Røssåga. Possible methods for detecti...
A traffic tunnel which is under construction passes through an anticline karst valley area in Chongq...
The design and construction of civil engineering structures in karst regions confronts many problems...
Afield study was carried out during the construction phase of the Kattleberg rail tunnel in Sweden t...
The new headrace tunnel at the water power station at Røssåga will be constructed with TBM and the p...
In a mature karstic system, the realisation of galleries using the methodology of railway tunnel bor...
In a mature karstic system, the realisation of galleries using the methodology of railway tunnel bor...
Karst environments are characterized by distinctive landforms and a peculiar hydrologic behavior dom...
Tunneling in Himalayan geological conditions can always present difficulties in underground excavati...
Rebuilding a hydropower plant into a pumped-storage plant in an underground tunnel, means that the w...
Successful sealing of tunnels by injection of grout into the fractured rock demands knowledge concer...
With the rapid developing trend of long, large and deep construction characteristics for underground...
The planned new railway station in Holmestrand whose location will be inside a basalt plateau poses ...
In this thesis, Rasuwagahdi Hydroelectric Project located in central region of Nepal, has been taken...
An increasing number of tunnels are being constructed with tunnel-boring machines (TBMs) due to the ...
Due to growth of the population in cities and limited space there is an increasing trend to move tra...
A traffic tunnel which is under construction passes through an anticline karst valley area in Chongq...
The design and construction of civil engineering structures in karst regions confronts many problems...
Afield study was carried out during the construction phase of the Kattleberg rail tunnel in Sweden t...
The new headrace tunnel at the water power station at Røssåga will be constructed with TBM and the p...
In a mature karstic system, the realisation of galleries using the methodology of railway tunnel bor...
In a mature karstic system, the realisation of galleries using the methodology of railway tunnel bor...
Karst environments are characterized by distinctive landforms and a peculiar hydrologic behavior dom...
Tunneling in Himalayan geological conditions can always present difficulties in underground excavati...
Rebuilding a hydropower plant into a pumped-storage plant in an underground tunnel, means that the w...
Successful sealing of tunnels by injection of grout into the fractured rock demands knowledge concer...
With the rapid developing trend of long, large and deep construction characteristics for underground...
The planned new railway station in Holmestrand whose location will be inside a basalt plateau poses ...
In this thesis, Rasuwagahdi Hydroelectric Project located in central region of Nepal, has been taken...
An increasing number of tunnels are being constructed with tunnel-boring machines (TBMs) due to the ...
Due to growth of the population in cities and limited space there is an increasing trend to move tra...
A traffic tunnel which is under construction passes through an anticline karst valley area in Chongq...
The design and construction of civil engineering structures in karst regions confronts many problems...
Afield study was carried out during the construction phase of the Kattleberg rail tunnel in Sweden t...