Industry 4.0 means a deep transformation for all our industries. Smart factories are a key feature for this transformation. Planning and scheduling are within the core functions of those smart factories. Although scheduling problems have been studied for long, the deployment of digital scheduling solutions in industries is still an ongoing process. In this work, we discuss the detailed scheduling problem in an aeronautical assembly line. It has the structure of a challenging multimode Resource-Constrained Scheduling Problem with incompatibility constraints, a resource leveling objective and also a high number of tasks. To begin with, we present two new event-based mixed-integer linear programming formulations for this problem. Then, a const...
This paper considers a scheduling problem with component availability con-straints in a supply chain...
Time-related optimization problems are very hard to solve. Scheduling covers a subcategory of such p...
The aerospace industry ranks among the largest manufacturing industries in the world facing a signif...
Industry 4.0 means a deep transformation for all our industries. Smart factories are a key feature f...
AbstractScheduling is becoming much more important in every industry. At the same time, scheduling p...
International audienceIn this work, we have solved a Time-Constrained Scheduling Problems (TCSP) rel...
We discuss the problem of project scheduling encountered in aircraft assembly workshop. The scheduli...
International audienceWe study a rescheduling problem in paced aircraft assembly lines with specific...
Assembling large-scale products, such as airplanes, locomotives, or wind turbines, involves frequent...
International audienceWe discuss the problem of project scheduling encountered in an assembly enterp...
This master's thesis addresses a scheduling problem arising when designing avionics – the electronic...
Scheduling of aircraft assembling activities is proven as a non-deterministic polynomial-time hard p...
Today\u27s time-based competition requires quick response to increasingly diverse and customized pro...
International audienceFor the enterprises organized in several distributed production sites, usually...
The simultaneous lot-sizing and production scheduling problem of a real-life large-scale industrial ...
This paper considers a scheduling problem with component availability con-straints in a supply chain...
Time-related optimization problems are very hard to solve. Scheduling covers a subcategory of such p...
The aerospace industry ranks among the largest manufacturing industries in the world facing a signif...
Industry 4.0 means a deep transformation for all our industries. Smart factories are a key feature f...
AbstractScheduling is becoming much more important in every industry. At the same time, scheduling p...
International audienceIn this work, we have solved a Time-Constrained Scheduling Problems (TCSP) rel...
We discuss the problem of project scheduling encountered in aircraft assembly workshop. The scheduli...
International audienceWe study a rescheduling problem in paced aircraft assembly lines with specific...
Assembling large-scale products, such as airplanes, locomotives, or wind turbines, involves frequent...
International audienceWe discuss the problem of project scheduling encountered in an assembly enterp...
This master's thesis addresses a scheduling problem arising when designing avionics – the electronic...
Scheduling of aircraft assembling activities is proven as a non-deterministic polynomial-time hard p...
Today\u27s time-based competition requires quick response to increasingly diverse and customized pro...
International audienceFor the enterprises organized in several distributed production sites, usually...
The simultaneous lot-sizing and production scheduling problem of a real-life large-scale industrial ...
This paper considers a scheduling problem with component availability con-straints in a supply chain...
Time-related optimization problems are very hard to solve. Scheduling covers a subcategory of such p...
The aerospace industry ranks among the largest manufacturing industries in the world facing a signif...