Since the first wave of nuclear reactors in 1970 to the construction of Generation III+ reactors in Finland and France in 2005 and 2007 respectively, nuclear power seems to be doomed to a cost escalation curse. In this paper we reexamine this issue for the French nuclear power fleet. Using the construction costs from the Cour des Comptes report, that was publicly available in 2012, we found that previous studies overestimated the cost escalation. Although, it is undeniable that the scale-up ended up in more costly reactors, we found evidence of a learning curve within the same size and type of reactors. This result confirms that standardization is a good direction to look, in order to overcome the cost escalation curse
The Fukushima disaster has lead the French government to release novel cost information relative to ...
Megaprojects are frequently over budget and late all over the world in many different sectors. Ther...
This report is concerned with the escalation of capital costs of nuclear central station power plant...
Since the first wave of nuclear reactors in 1970 to the construction of Generation III+ reactors in ...
Since the first wave of nuclear reactors in 1970 to the construction of Generation III+ reactors in ...
The paper reviews the history and the economics of the French PWR program, which is arguably the mos...
The paper reviews the history and the economics of the French PWR program, which is arguably the mos...
This paper provides the first comparative analysis of nuclear reactor construction costs in France a...
This paper provides the first comparative analysis of nuclear reactor construction costs in France a...
AbstractThe existing literature on the construction costs of nuclear power reactors has focused almo...
AbstractThe existing literature on the construction costs of nuclear power reactors has focused almo...
International audienceThis paper provides an econometric analysis of nuclear reactor construction co...
This work seeks to evaluate overnight construction costs (OCC) and lead time escalation of nuclear r...
This paper provides the first comparative analysis of nuclear reactor construction costs in France a...
This work seeks to evaluate overnight construction costs (OCC) and lead time escalation of nuclear r...
The Fukushima disaster has lead the French government to release novel cost information relative to ...
Megaprojects are frequently over budget and late all over the world in many different sectors. Ther...
This report is concerned with the escalation of capital costs of nuclear central station power plant...
Since the first wave of nuclear reactors in 1970 to the construction of Generation III+ reactors in ...
Since the first wave of nuclear reactors in 1970 to the construction of Generation III+ reactors in ...
The paper reviews the history and the economics of the French PWR program, which is arguably the mos...
The paper reviews the history and the economics of the French PWR program, which is arguably the mos...
This paper provides the first comparative analysis of nuclear reactor construction costs in France a...
This paper provides the first comparative analysis of nuclear reactor construction costs in France a...
AbstractThe existing literature on the construction costs of nuclear power reactors has focused almo...
AbstractThe existing literature on the construction costs of nuclear power reactors has focused almo...
International audienceThis paper provides an econometric analysis of nuclear reactor construction co...
This work seeks to evaluate overnight construction costs (OCC) and lead time escalation of nuclear r...
This paper provides the first comparative analysis of nuclear reactor construction costs in France a...
This work seeks to evaluate overnight construction costs (OCC) and lead time escalation of nuclear r...
The Fukushima disaster has lead the French government to release novel cost information relative to ...
Megaprojects are frequently over budget and late all over the world in many different sectors. Ther...
This report is concerned with the escalation of capital costs of nuclear central station power plant...