In the regulatory documents of the Ministry of Energy and Coal Industry of Ukraine, the beyond-design operating life of the high-energy equipment of 220 MW power units is limited to the operating life of 220 thousand hours and 800 start-ups. To date, the high-temperature cast bodies of the control valves for the high- and intermediate-pressure cylinders of the K-200-130 200 MW steam turbines of DTEK Lugansk TPP have operated about 305–330 thousand hours with the total number of start-ups from 1438 to 1704, which exceeded the beyond-design service life characteristics. Therefore, it is necessary to assess the residual operating life of the control valve bodies of the high- and intermediate-pressure cylinders of K-200-130 steam turbines in or...
The paper provides a comprehensive scheme for assessment of the residual service life and extension ...
When optimising power plants production schedules to be submitted in the deregulated market, it is n...
The aim of this paper is to design a method for assessing the life of steam pipes for Czech power pl...
200 MW steam turbines of DTEK Lugansk TPP units have operated for about 305–330 thousand hours with ...
To date, the fleet service life of a significant number of DTEK Energy power units is ex-ceeded. In ...
Thick walled components such as high pressure (HP) steam turbine casings operating under high parame...
Thick walled components such as high pressure (HP) steam turbine casings operating under high parame...
The development of centralized heat supply for large cities requires the estimation of the individua...
The purpose of this paper is to determine the most stressful zones and assess the possibility of pla...
A large and growing portion of electricity is produced by aging thermal power plants. Although excel...
In the deregulated market scenario wider power generation flexibility with respect to the past is ne...
In the deregulated market scenario wider power generation flexibility with respect to the past is ne...
In the deregulated market scenario wider power generation flexibility with respect to the past is ne...
Since the introduction of a deregulated energy market in Italy, new strategies in plants and systems...
The liberalization of electricity market in Europe led to a growing competition between energy produ...
The paper provides a comprehensive scheme for assessment of the residual service life and extension ...
When optimising power plants production schedules to be submitted in the deregulated market, it is n...
The aim of this paper is to design a method for assessing the life of steam pipes for Czech power pl...
200 MW steam turbines of DTEK Lugansk TPP units have operated for about 305–330 thousand hours with ...
To date, the fleet service life of a significant number of DTEK Energy power units is ex-ceeded. In ...
Thick walled components such as high pressure (HP) steam turbine casings operating under high parame...
Thick walled components such as high pressure (HP) steam turbine casings operating under high parame...
The development of centralized heat supply for large cities requires the estimation of the individua...
The purpose of this paper is to determine the most stressful zones and assess the possibility of pla...
A large and growing portion of electricity is produced by aging thermal power plants. Although excel...
In the deregulated market scenario wider power generation flexibility with respect to the past is ne...
In the deregulated market scenario wider power generation flexibility with respect to the past is ne...
In the deregulated market scenario wider power generation flexibility with respect to the past is ne...
Since the introduction of a deregulated energy market in Italy, new strategies in plants and systems...
The liberalization of electricity market in Europe led to a growing competition between energy produ...
The paper provides a comprehensive scheme for assessment of the residual service life and extension ...
When optimising power plants production schedules to be submitted in the deregulated market, it is n...
The aim of this paper is to design a method for assessing the life of steam pipes for Czech power pl...