Subtitle D of the Resource Conservation and Recovery Act (RCRA) requires a post closure period of 30 years for non hazardous wastes in landfills. Post closure care (PCC) activities under Subtitle D include leachate collection and treatment, groundwater monitoring, inspection and maintenance of the final cover, and monitoring to ensure that landfill gas does not migrate off site or into on site buildings. The decision to reduce PCC duration requires exploration of a performance based methodology to Florida landfills. PCC should be based on whether the landfill is a threat to human health or the environment. Historically no risk based procedure has been available to establish an early end to PCC. Landfill stability depends on a number of fact...
There is a finite period of time during which the plastic sheeting upper composite liner and lower p...
Corrective Action Unit (CAU) 424, the Area 3 Landfill Complexes at Tonopah Test Range, consists of e...
Design, operation, and closure practices for Class I municipal solid waste (MSW) landfills are based...
Subtitle D of the Resource Conservation and Recovery Act (RCRA) requires a post closure period of 30...
Subtitle D of the Resource Conservation and Recovery Act (RCRA) requires a post closure period of 30...
Subtitle D of the Resource Conservation and Recovery Act (RCRA) requires a post closure period of 30...
Subtitle D of the Resource Conservation and Recovery Act (RCRA) requires a post closure period of 30...
According to solid waste facility regulations codified in 40 CFR §258.61(b), the 30-year PCC period ...
According to solid waste facility regulations codified in 40 CFR §258.61(b), the 30-year PCC period ...
According to solid waste facility regulations codified in 40 CFR §258.61(b), the 30-year PCC period ...
This study is an evaluation of Post Closure Care (PCC) duration of landfills using performance based...
This study is an evaluation of Post Closure Care (PCC) duration of landfills using performance based...
Management of a landfill is a continuous process that proceeds long after the active landfill period...
This thesis details the development of a post-closure management plan for a hazardous waste landfill...
Corrective Action Unit (CAU) 424, the Area 3 Landfill Complex at Tonopah Test Range, consists of eig...
There is a finite period of time during which the plastic sheeting upper composite liner and lower p...
Corrective Action Unit (CAU) 424, the Area 3 Landfill Complexes at Tonopah Test Range, consists of e...
Design, operation, and closure practices for Class I municipal solid waste (MSW) landfills are based...
Subtitle D of the Resource Conservation and Recovery Act (RCRA) requires a post closure period of 30...
Subtitle D of the Resource Conservation and Recovery Act (RCRA) requires a post closure period of 30...
Subtitle D of the Resource Conservation and Recovery Act (RCRA) requires a post closure period of 30...
Subtitle D of the Resource Conservation and Recovery Act (RCRA) requires a post closure period of 30...
According to solid waste facility regulations codified in 40 CFR §258.61(b), the 30-year PCC period ...
According to solid waste facility regulations codified in 40 CFR §258.61(b), the 30-year PCC period ...
According to solid waste facility regulations codified in 40 CFR §258.61(b), the 30-year PCC period ...
This study is an evaluation of Post Closure Care (PCC) duration of landfills using performance based...
This study is an evaluation of Post Closure Care (PCC) duration of landfills using performance based...
Management of a landfill is a continuous process that proceeds long after the active landfill period...
This thesis details the development of a post-closure management plan for a hazardous waste landfill...
Corrective Action Unit (CAU) 424, the Area 3 Landfill Complex at Tonopah Test Range, consists of eig...
There is a finite period of time during which the plastic sheeting upper composite liner and lower p...
Corrective Action Unit (CAU) 424, the Area 3 Landfill Complexes at Tonopah Test Range, consists of e...
Design, operation, and closure practices for Class I municipal solid waste (MSW) landfills are based...