A methodology for the conceptual design phase risk assessment of an aerospace system was proposed. The method was designed to examine political, social, and economic risk over a systems lifecycle through the use of future scenarios to bound uncertainty. A decision support framework was developed to allow the user to visualize the differences in performance and economic metrics between design options as well as allowing the user to visualize the effects of mitigating certain risks. A historical proof of concept was developed to test the methodology. The results indicated that the new method will work to examine political, social, and economic risk during conceptual level design, and that this information can be used to aid in design down-sel...
Organizations are exposed to several types of risks, such as environmental, legal, operational, fina...
The current methodologies used in risk assessment are heavily subjective and inaccurate in various l...
The DoD Risk Management Guide requires risk assessment of acquisition performance, cost and schedule...
Design of complex, one-of-a-kind systems, such as space transportation systems, is characterized by ...
Design of complex, one-of-a-kind systems, such as space transportation systems, is characterized by ...
The conceptual design phase of an aerospace system development program is typically characterized by...
Compared to other industries, the aerospace sector is characterized by long product cycles in a very...
In the last half century, the aerospace industry has seen a dramatic paradigm shift from a focus on ...
In the last half century, the aerospace industry has seen a dramatic paradigm shift from a focus on ...
This paper describes the concept of Risk Based Design in the context of NASA’s low volume, high cost...
Presented at the 17th Annual Conference of the International Society of Parametric Analysts, San Die...
This viewgraph presentation introduces a methodology for incorporating risk analysis and technology ...
Presented at the 2nd AIAA ATIO Forum, Los Angeles, CA, October 1-3, 2002.From the dawn of human flig...
Organizations are exposed to several types of risks, such as environmental, legal, operational, fina...
In an era of shrinking development budgets and resources, where there is also an emphasis on reducin...
Organizations are exposed to several types of risks, such as environmental, legal, operational, fina...
The current methodologies used in risk assessment are heavily subjective and inaccurate in various l...
The DoD Risk Management Guide requires risk assessment of acquisition performance, cost and schedule...
Design of complex, one-of-a-kind systems, such as space transportation systems, is characterized by ...
Design of complex, one-of-a-kind systems, such as space transportation systems, is characterized by ...
The conceptual design phase of an aerospace system development program is typically characterized by...
Compared to other industries, the aerospace sector is characterized by long product cycles in a very...
In the last half century, the aerospace industry has seen a dramatic paradigm shift from a focus on ...
In the last half century, the aerospace industry has seen a dramatic paradigm shift from a focus on ...
This paper describes the concept of Risk Based Design in the context of NASA’s low volume, high cost...
Presented at the 17th Annual Conference of the International Society of Parametric Analysts, San Die...
This viewgraph presentation introduces a methodology for incorporating risk analysis and technology ...
Presented at the 2nd AIAA ATIO Forum, Los Angeles, CA, October 1-3, 2002.From the dawn of human flig...
Organizations are exposed to several types of risks, such as environmental, legal, operational, fina...
In an era of shrinking development budgets and resources, where there is also an emphasis on reducin...
Organizations are exposed to several types of risks, such as environmental, legal, operational, fina...
The current methodologies used in risk assessment are heavily subjective and inaccurate in various l...
The DoD Risk Management Guide requires risk assessment of acquisition performance, cost and schedule...