This thesis consists of theoretical and practical parts. The theoretical part contains an analysis of the problems of wireless networkssolutions individual standards and methodologies to ensure quality of service. In the practical part using the OPNET Modeler, a number of different simulation models and their evaluation. It is a model of individual standards, support mobility and interference effects on quality of service
In recent years, wireless local area networks (WLANs) have been very popular for the last mile conn...
I hereby declare that I am the sole author of this thesis. This is a true copy of the thesis, includ...
This paper focuses on QoS analysis carried out through analytical modelling and experimental evaluat...
The main aim of this thesis is to familiarize with options of services using real-time data transfer...
This master’s thesis is focused on ensuring of Quality of Service (QoS) in wireless network for stan...
This thesis discusses wireless network standards 802.11a/b/g/n. First part explains basic principles...
The aim of this bachelor work is project and simulation of wireless network with the Quality of Serv...
Subject of this thesis was the issue of effectiveness of wireless networks from the perspective of s...
The bachelor´s work deals with wireless network WiFi and describes basic standards and their supplem...
Wireless networks are currently the frequent access connection to the local network or the Internet....
Quality of service differentiation has never achieved much attention and relevance until the advent ...
Mobile and wireless communication systems are becoming more and more complex, making understanding t...
The bachelor's thesis deals with problematics of data transmission control in converged networks whi...
Various simulation tools play very important role in today’s engineering & technological projects an...
The bachelor’s thesis gives the basic information about the solution of a problem with Quality of Se...
In recent years, wireless local area networks (WLANs) have been very popular for the last mile conn...
I hereby declare that I am the sole author of this thesis. This is a true copy of the thesis, includ...
This paper focuses on QoS analysis carried out through analytical modelling and experimental evaluat...
The main aim of this thesis is to familiarize with options of services using real-time data transfer...
This master’s thesis is focused on ensuring of Quality of Service (QoS) in wireless network for stan...
This thesis discusses wireless network standards 802.11a/b/g/n. First part explains basic principles...
The aim of this bachelor work is project and simulation of wireless network with the Quality of Serv...
Subject of this thesis was the issue of effectiveness of wireless networks from the perspective of s...
The bachelor´s work deals with wireless network WiFi and describes basic standards and their supplem...
Wireless networks are currently the frequent access connection to the local network or the Internet....
Quality of service differentiation has never achieved much attention and relevance until the advent ...
Mobile and wireless communication systems are becoming more and more complex, making understanding t...
The bachelor's thesis deals with problematics of data transmission control in converged networks whi...
Various simulation tools play very important role in today’s engineering & technological projects an...
The bachelor’s thesis gives the basic information about the solution of a problem with Quality of Se...
In recent years, wireless local area networks (WLANs) have been very popular for the last mile conn...
I hereby declare that I am the sole author of this thesis. This is a true copy of the thesis, includ...
This paper focuses on QoS analysis carried out through analytical modelling and experimental evaluat...