This document summarises the LHC machine availability for the period of Restart to Technical Stop 1 (TS1) in 2016. This period was dedicated to restart of the LHC for proton physics with a bunch spacing of 25ns. This note has been produced and ratified by the LHC Availability Working Group which has complied fault information for the period in question using the Accelerator Fault Tracker
As any other accelerator, the LHC has to undertake periods of stop for maintenance. Five technical s...
This document presents a reassessment for 2016 and an estimate for 2017 of computing resources neede...
During the winter 2016/2017 the LHC will undertake a period of maintenance, the so-called Extended Y...
This document summarises the LHC machine availability for the period of Restart to Technical Stop 1 ...
This document summarises the LHC machine availability for the period of Technical Stop 1 (TS1) to Te...
This document summarises the LHC machine availability for the period of Restart to Technical Stop 1 ...
This document summarises the LHC machine availability for the period of Technical Stop 1 (TS1) to Te...
This document summarises the LHC machine availability for the period of Restart to Technical Stop 1 ...
This document summarises the LHC machine availability for the period of Restart to Technical Stop 3 ...
This document summarises the LHC machine availability for the period of Technical Stop 1 (TS1) to Te...
This document summarises the injector availability during 2018. This note has been produced and rati...
Availability is one of the key performance indicators of LHC operation, being directly correlated wi...
LHC operation restarted in 2015 after the first Long Shutdown, planning for a 4-year long run until ...
"The Large Hadron Collider (LHC) is finally set to restart in mid-November following last year's acc...
Availability is one of the key factors to be taken into account to improve the LHC performance after...
As any other accelerator, the LHC has to undertake periods of stop for maintenance. Five technical s...
This document presents a reassessment for 2016 and an estimate for 2017 of computing resources neede...
During the winter 2016/2017 the LHC will undertake a period of maintenance, the so-called Extended Y...
This document summarises the LHC machine availability for the period of Restart to Technical Stop 1 ...
This document summarises the LHC machine availability for the period of Technical Stop 1 (TS1) to Te...
This document summarises the LHC machine availability for the period of Restart to Technical Stop 1 ...
This document summarises the LHC machine availability for the period of Technical Stop 1 (TS1) to Te...
This document summarises the LHC machine availability for the period of Restart to Technical Stop 1 ...
This document summarises the LHC machine availability for the period of Restart to Technical Stop 3 ...
This document summarises the LHC machine availability for the period of Technical Stop 1 (TS1) to Te...
This document summarises the injector availability during 2018. This note has been produced and rati...
Availability is one of the key performance indicators of LHC operation, being directly correlated wi...
LHC operation restarted in 2015 after the first Long Shutdown, planning for a 4-year long run until ...
"The Large Hadron Collider (LHC) is finally set to restart in mid-November following last year's acc...
Availability is one of the key factors to be taken into account to improve the LHC performance after...
As any other accelerator, the LHC has to undertake periods of stop for maintenance. Five technical s...
This document presents a reassessment for 2016 and an estimate for 2017 of computing resources neede...
During the winter 2016/2017 the LHC will undertake a period of maintenance, the so-called Extended Y...