The First Long Shutdown (LS1) of the LHC and its Injector chain, which started in February 2013, was completed by the first quarter 2015. A huge number of activities have been performed; this paper reviews the process of the coordination of LS1 from the preparatory phase to the testing phase. The preparatory phase is a very important process: an accurate view of what is to be done, and what can be done is essential. But reality is always different, the differences between what was planned and what was done will be described. The paper will recall the coordination, reporting and decisional processes, highlighting points of success and points to be improved in terms of general coordination, in-situ coordination, safety coordination, logistics...
After a successful first running period, LHC is now well into a two year shutdown for extensive cons...
The shutdown originally planned for 2011-13 is the first opportunity since physics operation started...
The LHC Collider start-up was successfully achieved on the 10 September 2008. This date is a milesto...
The LHC and its Injectors were stopped in February 2013, in order to maintain, consolidate and upgra...
The goal of Long Shutdown 1 (LS1) is to perform the full maintenance of equipment, and the necessary...
The LHC and its Injectors are submitted to an overall lifecycle of three to four years of physics de...
The first shutdown of the LHC machine started on the 17th of November 2008. In addition to typical s...
Many conference series have adopted the same The first shutdown of the LHC machine started on the 17...
After 3 years of operation, the LHC entered its first Long Shutdown period (LS1), in February 2013 [...
The first LHC long shutdown (LS1) started in February 2013. It was triggered by the need to consolid...
For two years (Spring 2013 - Spring 2015), the LHC went through its first long shutdown (LS1). It wa...
The LHC has just come to the end of its first Long Shutdown (LS1) and preparations are underway to p...
The development of a reliable monitoring system was a key element in the successful consolidation an...
After a very successful run-1, the LHC accelerator and the LHC experiments had undergone intensive c...
During the long shutdown 1 (LS1), several maintenance, consolidation and upgrade activities have bee...
After a successful first running period, LHC is now well into a two year shutdown for extensive cons...
The shutdown originally planned for 2011-13 is the first opportunity since physics operation started...
The LHC Collider start-up was successfully achieved on the 10 September 2008. This date is a milesto...
The LHC and its Injectors were stopped in February 2013, in order to maintain, consolidate and upgra...
The goal of Long Shutdown 1 (LS1) is to perform the full maintenance of equipment, and the necessary...
The LHC and its Injectors are submitted to an overall lifecycle of three to four years of physics de...
The first shutdown of the LHC machine started on the 17th of November 2008. In addition to typical s...
Many conference series have adopted the same The first shutdown of the LHC machine started on the 17...
After 3 years of operation, the LHC entered its first Long Shutdown period (LS1), in February 2013 [...
The first LHC long shutdown (LS1) started in February 2013. It was triggered by the need to consolid...
For two years (Spring 2013 - Spring 2015), the LHC went through its first long shutdown (LS1). It wa...
The LHC has just come to the end of its first Long Shutdown (LS1) and preparations are underway to p...
The development of a reliable monitoring system was a key element in the successful consolidation an...
After a very successful run-1, the LHC accelerator and the LHC experiments had undergone intensive c...
During the long shutdown 1 (LS1), several maintenance, consolidation and upgrade activities have bee...
After a successful first running period, LHC is now well into a two year shutdown for extensive cons...
The shutdown originally planned for 2011-13 is the first opportunity since physics operation started...
The LHC Collider start-up was successfully achieved on the 10 September 2008. This date is a milesto...