The variety of beams, needed to set-up in the injectors as requested in the LHC, are reviewed, in terms of priority but also performance expectations and reach during 2015. This includes the single bunch beams for machine commissioning and measurements (probe, Indiv) but also the standard physics beams with 50 ns and 25 ns bunch spacing and their high brightness variants using the Bunch Compression Merging and Splitting (BCMS) scheme. The required parameters and target performance of special beams like the doublet for electron cloud enhancement and the more exotic 8b$\oplus$4e beam, compatible with some post-scrubbing scenarios are also described. The progress and plans for the LHC ion production beams during 2014-2015 are detailed. Highlig...
In preparation for the 2008 LHC beam operation, commissioning procedures were established by the com...
The possible upgrade of the LHC injector chain is a crucial step towards the LHC luminosity upgrade ...
I report the results of a CERN task force set up to investigate a possible staged upgrade of the LHC...
For the 2015 LHC start up and operation, the injec-tors will be requested to provide a large variety...
This paper shows the baseline LHC machine parameters for the 2015 start-up. Many systems have been u...
Between 2015 and 2018 the LHC was operated with protons at beam energies of 6.5 TeV with an integrat...
The flexibility of the LHC injectors combined with multiple longitudinal beam gymnastics have signif...
In 2015 LHC started operation at a beam energy of 6.5 TeV. After a two month beam commissioning peri...
In 2015 the Large Hadron Collider (LHC) entered the first year in its second long Run, after a 2-yea...
The LHC pre-injector complex, comprising Linac 2, the PS Booster (PSB) and the PS, has undergone a m...
LHC operation restarted in 2015 after the first Long Shutdown, planning for a 4-year long run until ...
CERN's LHC injectors are delivering high-brightness proton and ion beams for the Large Hadron Collid...
A large diversity of beams have been prepared in the LHC injectors in the past few years, such as si...
The Large Hadron Collider (LHC) at CERN (Geneva) was commissioned and operated in the years 2009-201...
The brief experience with 25 ns beams in the LHC at the end of Run 1 suggested that the electron clo...
In preparation for the 2008 LHC beam operation, commissioning procedures were established by the com...
The possible upgrade of the LHC injector chain is a crucial step towards the LHC luminosity upgrade ...
I report the results of a CERN task force set up to investigate a possible staged upgrade of the LHC...
For the 2015 LHC start up and operation, the injec-tors will be requested to provide a large variety...
This paper shows the baseline LHC machine parameters for the 2015 start-up. Many systems have been u...
Between 2015 and 2018 the LHC was operated with protons at beam energies of 6.5 TeV with an integrat...
The flexibility of the LHC injectors combined with multiple longitudinal beam gymnastics have signif...
In 2015 LHC started operation at a beam energy of 6.5 TeV. After a two month beam commissioning peri...
In 2015 the Large Hadron Collider (LHC) entered the first year in its second long Run, after a 2-yea...
The LHC pre-injector complex, comprising Linac 2, the PS Booster (PSB) and the PS, has undergone a m...
LHC operation restarted in 2015 after the first Long Shutdown, planning for a 4-year long run until ...
CERN's LHC injectors are delivering high-brightness proton and ion beams for the Large Hadron Collid...
A large diversity of beams have been prepared in the LHC injectors in the past few years, such as si...
The Large Hadron Collider (LHC) at CERN (Geneva) was commissioned and operated in the years 2009-201...
The brief experience with 25 ns beams in the LHC at the end of Run 1 suggested that the electron clo...
In preparation for the 2008 LHC beam operation, commissioning procedures were established by the com...
The possible upgrade of the LHC injector chain is a crucial step towards the LHC luminosity upgrade ...
I report the results of a CERN task force set up to investigate a possible staged upgrade of the LHC...