CERN has put in place an ambitious improvement programme to make the injector chain of the LHC capable of supplying the high intensity and high brightness beams requested by the High-Luminosity LHC (HL-LHC) project. The LHC Injectors Upgrade (LIU) project comprises a new Linac (Linac4) as well as major upgrades and renovations of the PSB, PS and SPS synchrotrons. The heavy ion injector chain is also included, adding Linac3 and LEIR to the list of accelerators concerned. This paper reports on the work completed during the first long LHC shutdown, and outlines the further upgrade path
The LIU project has as mandate the upgrade of the LHC injector chain to match the requirements of HL...
Looking beyond the commissioning of the LHC, which is expected to start at the end of 2007, CERN is ...
Looking beyond the commissioning of the LHC, which is expected to start at the end of 2007, CERN is ...
A massive improvement program of the LHC injector chain is presently being conducted under the LIU p...
CERN is currently carrying out an ambitious improvement programme of the full LHC Injectors chain in...
The LHC Injectors Upgrade (LIU) project at CERN aims at delivering high brightness beams required by...
The LHC Injectors Upgrade (LIU) project aims at increasing the intensity and brightness in the LHC i...
The LHC injectors upgrade (LIU) project has been launched at the end of 2010 to prepare the CERN acc...
The LHC injector chain for Pb-ion beams at CERN consists of Linac3, the accumulator ring LEIR, the P...
Challenging beams with much higher brightness than today are required for the LHC to achieve its hig...
The CERN PS Booster (PSB) is presently undergoing an ambitious consolidation and upgrade program wit...
One of the main goals of the CERN Long-Shutdown 2 (LS2) is to improve the performance of the injecto...
The LHC Injectors Upgrade project (LIU) has been initiated to improve the performances of the existi...
CERN’s Proton Synchrotron Booster (PSB) is undergoing a major upgrade program in the frame of the LH...
The LHC Injectors Upgrade project (LIU) has been initiated to improve the performances of the existi...
The LIU project has as mandate the upgrade of the LHC injector chain to match the requirements of HL...
Looking beyond the commissioning of the LHC, which is expected to start at the end of 2007, CERN is ...
Looking beyond the commissioning of the LHC, which is expected to start at the end of 2007, CERN is ...
A massive improvement program of the LHC injector chain is presently being conducted under the LIU p...
CERN is currently carrying out an ambitious improvement programme of the full LHC Injectors chain in...
The LHC Injectors Upgrade (LIU) project at CERN aims at delivering high brightness beams required by...
The LHC Injectors Upgrade (LIU) project aims at increasing the intensity and brightness in the LHC i...
The LHC injectors upgrade (LIU) project has been launched at the end of 2010 to prepare the CERN acc...
The LHC injector chain for Pb-ion beams at CERN consists of Linac3, the accumulator ring LEIR, the P...
Challenging beams with much higher brightness than today are required for the LHC to achieve its hig...
The CERN PS Booster (PSB) is presently undergoing an ambitious consolidation and upgrade program wit...
One of the main goals of the CERN Long-Shutdown 2 (LS2) is to improve the performance of the injecto...
The LHC Injectors Upgrade project (LIU) has been initiated to improve the performances of the existi...
CERN’s Proton Synchrotron Booster (PSB) is undergoing a major upgrade program in the frame of the LH...
The LHC Injectors Upgrade project (LIU) has been initiated to improve the performances of the existi...
The LIU project has as mandate the upgrade of the LHC injector chain to match the requirements of HL...
Looking beyond the commissioning of the LHC, which is expected to start at the end of 2007, CERN is ...
Looking beyond the commissioning of the LHC, which is expected to start at the end of 2007, CERN is ...