The DAQ system of the CMS experiment at CERN collects data from more than 600 custom detector Front-End Drivers (FEDs). During 2013 and 2014 the CMS DAQ system will undergo a major upgrade to address the obsolescence of current hardware and the requirements posed by the upgrade of the LHC accelerator and various detector components. For a loss-less data collection from the FEDs a new FPGA based card implementing the TCP/IP protocol suite over 10Gbps Ethernet has been developed. To limit the TCP hardware implementation complexity the DAQ group developed a simplified and unidirectional but RFC~793 compliant version of the TCP protocol. This allows to use a PC with the standard Linux TCP/IP stack as a receiver. We present the challenges and pr...
The data acquisition system (DAQ) of the CMS experiment at the CERN Large Hadron Collider (LHC) asse...
The LHCb High Level Trigger and Data Acquisition system selects about 2 kHz of events out of the 1 M...
The goal of the LHCb readout upgrade is to speed up the DAQ to 40 MHz. Such a DAQ system will certai...
For the upgrade of the DAQ of the CMS experiment in 2013/2014 an interface between the custom detect...
For the upgrade of the DAQ of the CMS experiment in 2013/2014 an interface between the custom detect...
The DAQ system of the CMS experiment at CERN collects data from more than 600 custom detector Front-...
The DAQ system of the CMS experiment at CERN collects data from more than 600 custom detector Front-...
With the increasing number of Internet services, the flexible and reliable TCP/IP protocol suite has...
The data acquisition system (DAQ) of the CMS experiment at the CERN Large Hadron Collider (LHC) asse...
The data acquisition system (DAQ) of the CMS experiment at the CERN Large Hadron Collider assembles ...
In the mid 2020s the ATLAS pixel detector will be replaced in preparation for the high luminosity ph...
Abstract—The data acquisition (DAQ) system of the CMS experiment at the CERN Large Hadron Collider a...
The goal of the LHCb readout upgrade is to accelerate the DAQ to 40 MHz. Such a DAQ system will cert...
The main objective of the thesis has been the design and implementation of a complete UDP/IP Etherne...
Transmission Control Protocol (TCP) and Ethernet have been widely used in readout systems. These pro...
The data acquisition system (DAQ) of the CMS experiment at the CERN Large Hadron Collider (LHC) asse...
The LHCb High Level Trigger and Data Acquisition system selects about 2 kHz of events out of the 1 M...
The goal of the LHCb readout upgrade is to speed up the DAQ to 40 MHz. Such a DAQ system will certai...
For the upgrade of the DAQ of the CMS experiment in 2013/2014 an interface between the custom detect...
For the upgrade of the DAQ of the CMS experiment in 2013/2014 an interface between the custom detect...
The DAQ system of the CMS experiment at CERN collects data from more than 600 custom detector Front-...
The DAQ system of the CMS experiment at CERN collects data from more than 600 custom detector Front-...
With the increasing number of Internet services, the flexible and reliable TCP/IP protocol suite has...
The data acquisition system (DAQ) of the CMS experiment at the CERN Large Hadron Collider (LHC) asse...
The data acquisition system (DAQ) of the CMS experiment at the CERN Large Hadron Collider assembles ...
In the mid 2020s the ATLAS pixel detector will be replaced in preparation for the high luminosity ph...
Abstract—The data acquisition (DAQ) system of the CMS experiment at the CERN Large Hadron Collider a...
The goal of the LHCb readout upgrade is to accelerate the DAQ to 40 MHz. Such a DAQ system will cert...
The main objective of the thesis has been the design and implementation of a complete UDP/IP Etherne...
Transmission Control Protocol (TCP) and Ethernet have been widely used in readout systems. These pro...
The data acquisition system (DAQ) of the CMS experiment at the CERN Large Hadron Collider (LHC) asse...
The LHCb High Level Trigger and Data Acquisition system selects about 2 kHz of events out of the 1 M...
The goal of the LHCb readout upgrade is to speed up the DAQ to 40 MHz. Such a DAQ system will certai...