The CERN PS Booster (PSB) is presently undergoing an ambitious consolidation and upgrade program within the frame of the LHC Injectors Upgrade (LIU) project. This program comprises a new injection scheme for H- ions from CERN’s new Linac4, the replacement of the main RF systems and an energy upgrade of the PSB rings from 1.4 to 2 GeV which includes the replacement of the main magnet power supply as well as the upgrade of the extraction equipment. This paper describes the status and plans of this work program
The LHC injectors upgrade (LIU) project has been launched at the end of 2010 to prepare the CERN acc...
One of the main goals of the CERN Long-Shutdown 2 (LS2) is to improve the performance of the injecto...
CERN is currently carrying out an ambitious improvement programme of the full LHC Injectors chain in...
CERN’s Proton Synchrotron Booster (PSB) is undergoing a major upgrade program in the frame of the LH...
The LHC Injectors Upgrade (LIU) project at CERN aims at delivering high brightness beams required by...
The paper presents the outstanding studies performed in 2016 in preparation of the PS Booster upgrad...
The aim of the LHC Injectors Upgrade (LIU) project at CERN is to upgrade the components of the accel...
CERN has put in place an ambitious improvement programme to make the injector chain of the LHC capab...
A massive improvement program of the LHC injector chain is presently being conducted under the LIU p...
The 160 MeV H- beam from the LINAC4 will be injected into the 4 superimposed rings of the PS Booster...
The LHC Injectors Upgrade (LIU) project aims at increasing the intensity and brightness in the LHC i...
At CERN Linac4 is being commissioned as first step in the LHC injector upgrade to provide 160 MeV H^...
In the framework of the LHC Injectors Upgrade project (LIU) the PS Booster (PSB) will undergo in dep...
CERN’s LHC injector chain will have to deliver beams with ultimate brilliance as the LHC is heading ...
CERN’s LHC injector chain will have to deliver beams with ultimate brilliance as the LHC is heading ...
The LHC injectors upgrade (LIU) project has been launched at the end of 2010 to prepare the CERN acc...
One of the main goals of the CERN Long-Shutdown 2 (LS2) is to improve the performance of the injecto...
CERN is currently carrying out an ambitious improvement programme of the full LHC Injectors chain in...
CERN’s Proton Synchrotron Booster (PSB) is undergoing a major upgrade program in the frame of the LH...
The LHC Injectors Upgrade (LIU) project at CERN aims at delivering high brightness beams required by...
The paper presents the outstanding studies performed in 2016 in preparation of the PS Booster upgrad...
The aim of the LHC Injectors Upgrade (LIU) project at CERN is to upgrade the components of the accel...
CERN has put in place an ambitious improvement programme to make the injector chain of the LHC capab...
A massive improvement program of the LHC injector chain is presently being conducted under the LIU p...
The 160 MeV H- beam from the LINAC4 will be injected into the 4 superimposed rings of the PS Booster...
The LHC Injectors Upgrade (LIU) project aims at increasing the intensity and brightness in the LHC i...
At CERN Linac4 is being commissioned as first step in the LHC injector upgrade to provide 160 MeV H^...
In the framework of the LHC Injectors Upgrade project (LIU) the PS Booster (PSB) will undergo in dep...
CERN’s LHC injector chain will have to deliver beams with ultimate brilliance as the LHC is heading ...
CERN’s LHC injector chain will have to deliver beams with ultimate brilliance as the LHC is heading ...
The LHC injectors upgrade (LIU) project has been launched at the end of 2010 to prepare the CERN acc...
One of the main goals of the CERN Long-Shutdown 2 (LS2) is to improve the performance of the injecto...
CERN is currently carrying out an ambitious improvement programme of the full LHC Injectors chain in...