In the framework of the High Intensity and Energy (HIE)-ISOLDE project at CERN, a beam instrumentation R&D program is on-going for the superconducting upgrade of the REX-ISOLDE heavy-ion post-accelerator. An overview of the foreseen beam diagnostics system is presented, focusing on the challenging specifications required by the HIE-ISOLDE linac. Due to the low beam intensities, the beam instrumentation will be based on high-sensitivity intercepting devices. The project includes intensity, position and transverse profile monitors to be installed in the very narrow space available in between the superconducting cryomodules. In addition, spectroscopy and time of flight (ToF) monitors are foreseen downstream of the linac to meas...
The HIE-ISOLDE project* (High Intensity and Energy ISOLDE) reached an important milestone in Septemb...
A silicon detector monitor has been developed and tested at REX-ISOLDE in the framework of the R&D p...
Phase 1a of the High Intensity and Energy ISOLDE (HIE-ISOLDE) project* was completed in 2015. The fi...
The HIE-ISOLDE project aims at upgrading the CERN ISOLDE radioactive ion beam facility for higher be...
The High Intensity and Energy (HIE) project represents a major upgrade of the ISOLDE (On-Line Isotop...
The High Intensity and Energy (HIE) project represents a major upgrade of the ISOLDE (On-Line Isotop...
Modern nuclear physics makes extensive use of exotic particle beams created using accelerators, such...
The HIE-ISOLDE project represents a major upgrade of the ISOLDE nuclear facility with a mandate to s...
The HIE-ISOLDE project represents a major upgrade of the ISOLDE facility with a mandate to significa...
The HIE-ISOLDE Linac (High Intensity and Energy) is a recent upgrade to the ISOLDE facility of CERN,...
The HIE-ISOLDE Linac (High Intensity and Energy) is a recent upgrade to the ISOLDE facility of CERN,...
A silicon detector monitor has been developed and tested in the framework of the beam diagnostics de...
In the framework of the HIE-ISOLDE project, the REX linac will be upgraded in stages to 5.5 MeV/u an...
In the frame of the HIE ISOLDE project most of the existing ISOLDE REX line will be replaced by a su...
The transverse emittance at the output of the REX-ISOLDE normal conducting linac has been measured a...
The HIE-ISOLDE project* (High Intensity and Energy ISOLDE) reached an important milestone in Septemb...
A silicon detector monitor has been developed and tested at REX-ISOLDE in the framework of the R&D p...
Phase 1a of the High Intensity and Energy ISOLDE (HIE-ISOLDE) project* was completed in 2015. The fi...
The HIE-ISOLDE project aims at upgrading the CERN ISOLDE radioactive ion beam facility for higher be...
The High Intensity and Energy (HIE) project represents a major upgrade of the ISOLDE (On-Line Isotop...
The High Intensity and Energy (HIE) project represents a major upgrade of the ISOLDE (On-Line Isotop...
Modern nuclear physics makes extensive use of exotic particle beams created using accelerators, such...
The HIE-ISOLDE project represents a major upgrade of the ISOLDE nuclear facility with a mandate to s...
The HIE-ISOLDE project represents a major upgrade of the ISOLDE facility with a mandate to significa...
The HIE-ISOLDE Linac (High Intensity and Energy) is a recent upgrade to the ISOLDE facility of CERN,...
The HIE-ISOLDE Linac (High Intensity and Energy) is a recent upgrade to the ISOLDE facility of CERN,...
A silicon detector monitor has been developed and tested in the framework of the beam diagnostics de...
In the framework of the HIE-ISOLDE project, the REX linac will be upgraded in stages to 5.5 MeV/u an...
In the frame of the HIE ISOLDE project most of the existing ISOLDE REX line will be replaced by a su...
The transverse emittance at the output of the REX-ISOLDE normal conducting linac has been measured a...
The HIE-ISOLDE project* (High Intensity and Energy ISOLDE) reached an important milestone in Septemb...
A silicon detector monitor has been developed and tested at REX-ISOLDE in the framework of the R&D p...
Phase 1a of the High Intensity and Energy ISOLDE (HIE-ISOLDE) project* was completed in 2015. The fi...