The electrical resistance of LHC main busbar cable splices without busbar Cu stabiliser at 4.3 K has been measured as a function of intercable overlap length with two independent methods. Splice resistances of 3 nΩ and 10 nΩ correspond to a cable overlap length of approximately 14 mm and 3 mm, respectively. The tensile strength at 4.3 K of these splices exceeds 2 kN (10 nΩ) and 3 kN (3 nΩ). The comparison of direct resistance measurement results (FRESCA and LHC) with resistance values calculated from the current decay constant of test loops show that over the resistance range 0.3-10 nΩ, the inductance of the test loops is about 310 nH, about 1.9 times the value that has been assumed so far
After the incident of September 2008, the operational beam energy of the LHC has been set to 3.5 TeV...
The Superconducting Link (SC-Link) being developed at CERN in the context of the LHC High-Luminosity...
After the incident of September 2008, the operational beam energy of the LHC has been set to 3.5 Te...
Following the QPS review in February 2009, a potential source of problems with the main circuit bus ...
At each interconnection between LHC main magnets a low-resistance solder joint must be made between ...
The electrical interconnections between the LHC main magnets are made of soldered joints (splices) o...
For the consolidation of the LHC main interconnection splices it is planned to solder shunts onto ea...
In the Large Hadron Collider (LHC), which is currently being developed at CERN, about 50,000 connect...
As part of the quality control the resistance of newly produced LHC main bus bar splices is now rout...
For the consolidation of the LHC 13 kA main interconnection splices, shunts will be soldered onto ea...
The interconnections between the LHC main magnets are made of soldered joints (splices) of two super...
The main busbar interconnection splices of the Large Hadron Collider are assembled by inductive sold...
The different LHC main bus bar splice components (bus bar cable, splice U-piece and wedge and bus ba...
The electrical resistance of superconducting cable splices is known to be in the 10{sup -9} {Omega} ...
To eliminate the risk of thermal runaways in LHC interconnections a consolidation by placing shunts ...
After the incident of September 2008, the operational beam energy of the LHC has been set to 3.5 TeV...
The Superconducting Link (SC-Link) being developed at CERN in the context of the LHC High-Luminosity...
After the incident of September 2008, the operational beam energy of the LHC has been set to 3.5 Te...
Following the QPS review in February 2009, a potential source of problems with the main circuit bus ...
At each interconnection between LHC main magnets a low-resistance solder joint must be made between ...
The electrical interconnections between the LHC main magnets are made of soldered joints (splices) o...
For the consolidation of the LHC main interconnection splices it is planned to solder shunts onto ea...
In the Large Hadron Collider (LHC), which is currently being developed at CERN, about 50,000 connect...
As part of the quality control the resistance of newly produced LHC main bus bar splices is now rout...
For the consolidation of the LHC 13 kA main interconnection splices, shunts will be soldered onto ea...
The interconnections between the LHC main magnets are made of soldered joints (splices) of two super...
The main busbar interconnection splices of the Large Hadron Collider are assembled by inductive sold...
The different LHC main bus bar splice components (bus bar cable, splice U-piece and wedge and bus ba...
The electrical resistance of superconducting cable splices is known to be in the 10{sup -9} {Omega} ...
To eliminate the risk of thermal runaways in LHC interconnections a consolidation by placing shunts ...
After the incident of September 2008, the operational beam energy of the LHC has been set to 3.5 TeV...
The Superconducting Link (SC-Link) being developed at CERN in the context of the LHC High-Luminosity...
After the incident of September 2008, the operational beam energy of the LHC has been set to 3.5 Te...