The LHC RF system commissioning with beam and physics operation for 2010 and 2011 are presented. It became clear in early 2010 that RF noise was not a lifetime limiting factor: the crossing of the much feared 50 Hz line for the synchrotron frequency did not affect the beam. The broadband LHC RF noise is reduced to a level that makes its contribution to beam diffusion in physics well below that of Intra Beam Scattering. Capture losses are also under control, at well below 0.5%. Longitudinal emittance blow-up, needed for ramping of the nominal intensity single bunch, was rapidly commissioned. In 2011, 3.5 TeV/beam physics has been conducted with 1380 bunches at 50 ns spacing, corresponding to 55% of the nominal current. The intensity per bunc...
Hardware commissioning of the LHC RF Systems, the ACS Superconducting RF systems, ADT Transverse Dam...
As part of the preparation of the PS as an injector for the LHC, a prototype 20 MHz rf system has be...
LHC commissioning made good progress in 2009 and 2010-a brief summary is presented. The present stat...
The RF system performance in 2011 is presented, with statistics on the High Level faults. The few de...
The ramp-up of the LHC operation has been exceptionally fast: from the first acceleration of a singl...
The highest priority for the RF group in 2011 was to contribute to a successful physics run of the L...
In 2011 the LHC moved from commissioning into the physics production phase with the aim of accumulat...
Hardware commissioning of the LHC RF system was successfully completed in time for first beams in LH...
Emittance measurements through the 2012 LHC proton cycle examined possible major sources for the lar...
After the September 19th 2008 incident and an intense year of recovery, consolidation and testing, L...
The LHC started up with beam in November 2009, and within less then on year its luminosity reached 2...
The main RF system of the LHC, which uses 400MHz superconducting cavities, will be used to capture, ...
The LHC operates using a 400 MHz SC RF system. A 200 MHz NC RF system was foreseen in the LHC Design...
Radio Frequency (RF) accelerating system noise and non-idealities can have detrimental impact on the...
The LHC RF consists of eight 400 MHz superconducting cavities per ring, with each cavity independent...
Hardware commissioning of the LHC RF Systems, the ACS Superconducting RF systems, ADT Transverse Dam...
As part of the preparation of the PS as an injector for the LHC, a prototype 20 MHz rf system has be...
LHC commissioning made good progress in 2009 and 2010-a brief summary is presented. The present stat...
The RF system performance in 2011 is presented, with statistics on the High Level faults. The few de...
The ramp-up of the LHC operation has been exceptionally fast: from the first acceleration of a singl...
The highest priority for the RF group in 2011 was to contribute to a successful physics run of the L...
In 2011 the LHC moved from commissioning into the physics production phase with the aim of accumulat...
Hardware commissioning of the LHC RF system was successfully completed in time for first beams in LH...
Emittance measurements through the 2012 LHC proton cycle examined possible major sources for the lar...
After the September 19th 2008 incident and an intense year of recovery, consolidation and testing, L...
The LHC started up with beam in November 2009, and within less then on year its luminosity reached 2...
The main RF system of the LHC, which uses 400MHz superconducting cavities, will be used to capture, ...
The LHC operates using a 400 MHz SC RF system. A 200 MHz NC RF system was foreseen in the LHC Design...
Radio Frequency (RF) accelerating system noise and non-idealities can have detrimental impact on the...
The LHC RF consists of eight 400 MHz superconducting cavities per ring, with each cavity independent...
Hardware commissioning of the LHC RF Systems, the ACS Superconducting RF systems, ADT Transverse Dam...
As part of the preparation of the PS as an injector for the LHC, a prototype 20 MHz rf system has be...
LHC commissioning made good progress in 2009 and 2010-a brief summary is presented. The present stat...