There is a large amount of backfilled earth on both sides of the wall and the top of the lower wall of the Daning Reservoir’s cutoff wall, which is greatly disturbed by the project, and the safety of the cutoff wall needs to be evaluated. Based on the deformation law and stress condition of rigid cutoff wall during construction, according to the connection characteristics of rigid cutoff wall and plastic cutoff wall structure, the stress analysis of rigid cutoff wall is carried out by using field measurement data, so as to deduce the deformation law of plastic cutoff wall underneath, and evaluate the safety of plastic cutoff wall. The results show that the plastic cutoff wall is mainly affected by compressive stress, and the maximum compres...
The construction of Songlin rock-filled concrete gravity dam, located in the Yunnan province, China ...
After the Wenchuan earthquake in 2008, the Zipingpu concrete faced rockfill dam (CFRD) was found sla...
Seepage is one of the main causes of failure of earthen dam. To encounter the seepage through the fo...
There is a large amount of backfilled earth on both sides of the wall and the top of the lower wall ...
The long-term stability analysis of cutoff wall affected by construction effect is crucial. The long...
The construction of a cut-off wall is a common reinforcement method for earth rock dams. At present,...
Relevance. Monitoring of earth-filled tailings dams deformation is an important element of industria...
Since the construction of dam is significantly important both according to economic and safety aspec...
The concrete cut off wall is usually used to control the seepage through the foundation of earth dam...
Polymer anti-seepage walls have been widely used in the anti-seepage reinforcement projects of earth...
Seepage and flow of water in the soil is one of the most important issue and effective elements in d...
Seepage through foundation of earth dams can be controlled using concrete cut off walls. The increas...
As dams are large structures often constructed on rock formations exhibiting material non-homogeneit...
The slope stability analysis of earthen dam for every aspect is very crucial because huge risk is re...
Stability of embankment dam with diaphragm cutoff wall constructed on riverbed sediment depends on s...
The construction of Songlin rock-filled concrete gravity dam, located in the Yunnan province, China ...
After the Wenchuan earthquake in 2008, the Zipingpu concrete faced rockfill dam (CFRD) was found sla...
Seepage is one of the main causes of failure of earthen dam. To encounter the seepage through the fo...
There is a large amount of backfilled earth on both sides of the wall and the top of the lower wall ...
The long-term stability analysis of cutoff wall affected by construction effect is crucial. The long...
The construction of a cut-off wall is a common reinforcement method for earth rock dams. At present,...
Relevance. Monitoring of earth-filled tailings dams deformation is an important element of industria...
Since the construction of dam is significantly important both according to economic and safety aspec...
The concrete cut off wall is usually used to control the seepage through the foundation of earth dam...
Polymer anti-seepage walls have been widely used in the anti-seepage reinforcement projects of earth...
Seepage and flow of water in the soil is one of the most important issue and effective elements in d...
Seepage through foundation of earth dams can be controlled using concrete cut off walls. The increas...
As dams are large structures often constructed on rock formations exhibiting material non-homogeneit...
The slope stability analysis of earthen dam for every aspect is very crucial because huge risk is re...
Stability of embankment dam with diaphragm cutoff wall constructed on riverbed sediment depends on s...
The construction of Songlin rock-filled concrete gravity dam, located in the Yunnan province, China ...
After the Wenchuan earthquake in 2008, the Zipingpu concrete faced rockfill dam (CFRD) was found sla...
Seepage is one of the main causes of failure of earthen dam. To encounter the seepage through the fo...