The LHC collimation system has been used for beam cleaning and passive machine protection this year for the first time. The hardware commissioning tests carried out in preparation for operations with beam are presented. The setup procedure towards nominal injection settings is analyzed together with reproducibility and total beam time spent for collimator setup. Locations of beam losses are reviewed and reasons for the highest losses investigated. The achieved cleaning efficiency is also discussed. Operational performance and stability of the system, interlock thresholds and interlock statistics (number of false interlocks generated) are treated. Software procedures, settings and threshold limits are analyzed, also in view of machine protec...
An overview of the collimation system performance during 2012 is described. The collimator " tight "...
The LHC collimation system protects passively the most sensitive machine equipment against beam loss...
A first sub-set of the collimation system has been installed for the 2008 first beam commissioning o...
The problem of collimation and beam cleaning is one of the most challenging aspects of the LHC proje...
The handling of the high-intensity LHC beams in a super-conducting environment requires a high-robus...
The problem of collimation and beam cleaning is one of the most challenging aspects of the LHC proje...
The handling of the high-intensity LHC beams in a super-conducting environment requires a high-robus...
LHC beam collimation is based on a hierarchical multi- stage cleaning system. Maintaining the correc...
LHC beam collimation is based on a hierarchical multistage cleaning system. Maintaining the correct ...
The Large Hadron Collider extends the present stateof- the-art in stored beam energy by 2-3 orders o...
Collimation systems in particle accelerators are designed to dispose of unavoidable losses safely an...
The LHC collimation system, ensuring both functions of beam cleaning and machine protection, is pote...
The main task of the LHC collimation system is to ensure safe and efficient operation, acting as fir...
An overview of the collimation system performance during 2012 is described. The collimator “tight” s...
The LHC collimation system, ensuring both functions of beam cleaning and machine protection, is pote...
An overview of the collimation system performance during 2012 is described. The collimator " tight "...
The LHC collimation system protects passively the most sensitive machine equipment against beam loss...
A first sub-set of the collimation system has been installed for the 2008 first beam commissioning o...
The problem of collimation and beam cleaning is one of the most challenging aspects of the LHC proje...
The handling of the high-intensity LHC beams in a super-conducting environment requires a high-robus...
The problem of collimation and beam cleaning is one of the most challenging aspects of the LHC proje...
The handling of the high-intensity LHC beams in a super-conducting environment requires a high-robus...
LHC beam collimation is based on a hierarchical multi- stage cleaning system. Maintaining the correc...
LHC beam collimation is based on a hierarchical multistage cleaning system. Maintaining the correct ...
The Large Hadron Collider extends the present stateof- the-art in stored beam energy by 2-3 orders o...
Collimation systems in particle accelerators are designed to dispose of unavoidable losses safely an...
The LHC collimation system, ensuring both functions of beam cleaning and machine protection, is pote...
The main task of the LHC collimation system is to ensure safe and efficient operation, acting as fir...
An overview of the collimation system performance during 2012 is described. The collimator “tight” s...
The LHC collimation system, ensuring both functions of beam cleaning and machine protection, is pote...
An overview of the collimation system performance during 2012 is described. The collimator " tight "...
The LHC collimation system protects passively the most sensitive machine equipment against beam loss...
A first sub-set of the collimation system has been installed for the 2008 first beam commissioning o...