After having served for the surface tests of the Compact Muon Solenoid (CMS) magnet, the cold box and ancillaries of the CMS helium refrigerator have been dismantled, moved and re-installed in the USC55 cavern in 2007. The full re-commissioning in the cavern has been followed by several tests of the refrigerator to confirm its nominal performance before it was used for the magnet and detector tests in 2008. During these tests the safety modes of the refrigeration system have been tested and improved. After a nine-year project both, the magnet and the refrigeration system are now ready for the CMS operation
The construction status of the CMS experiment at the Large Hadron Collider and strategies for commis...
CMS (Compact Muon Solenoid) is a general-purpose detector designed to run in mid-2005 at the highest...
The electronics systems used to control, trigger, and acquire data from the four experiments at LHC ...
A new helium refrigeration plant with a cooling capacity of 800 W at 4.45 K, 4500 W between 60 K and...
At CERN a new helium refrigeration plant specified for a cooling capacity of 800 W at 4.45 K, 4500 W...
The design concept of the CMS experiment, foreseen for the Large Hadron Collider (LHC) project at CE...
During the second half of 2006 a first combined test of almost all sub-systems of the Compact Muon S...
The status of the construction and installation of the CMS detector is reviewed. The 4T magnet is co...
CMS (Compact Muon Solenoid) is one of the large experiments for the LHC at CERN. The superconducting...
International audienceThe status of the construction and installation of the CMS detector is reviewe...
International audienceThe status of the construction and installation of the CMS detector is reviewe...
International audienceThe status of the construction and installation of the CMS detector is reviewe...
International audienceThe status of the construction and installation of the CMS detector is reviewe...
International audienceThe status of the construction and installation of the CMS detector is reviewe...
The CMS detector is under construction for imminent operation at the Large Hadron Collider at CERN n...
The construction status of the CMS experiment at the Large Hadron Collider and strategies for commis...
CMS (Compact Muon Solenoid) is a general-purpose detector designed to run in mid-2005 at the highest...
The electronics systems used to control, trigger, and acquire data from the four experiments at LHC ...
A new helium refrigeration plant with a cooling capacity of 800 W at 4.45 K, 4500 W between 60 K and...
At CERN a new helium refrigeration plant specified for a cooling capacity of 800 W at 4.45 K, 4500 W...
The design concept of the CMS experiment, foreseen for the Large Hadron Collider (LHC) project at CE...
During the second half of 2006 a first combined test of almost all sub-systems of the Compact Muon S...
The status of the construction and installation of the CMS detector is reviewed. The 4T magnet is co...
CMS (Compact Muon Solenoid) is one of the large experiments for the LHC at CERN. The superconducting...
International audienceThe status of the construction and installation of the CMS detector is reviewe...
International audienceThe status of the construction and installation of the CMS detector is reviewe...
International audienceThe status of the construction and installation of the CMS detector is reviewe...
International audienceThe status of the construction and installation of the CMS detector is reviewe...
International audienceThe status of the construction and installation of the CMS detector is reviewe...
The CMS detector is under construction for imminent operation at the Large Hadron Collider at CERN n...
The construction status of the CMS experiment at the Large Hadron Collider and strategies for commis...
CMS (Compact Muon Solenoid) is a general-purpose detector designed to run in mid-2005 at the highest...
The electronics systems used to control, trigger, and acquire data from the four experiments at LHC ...