This paper investigated the problem of simultaneous determination of lot-sizing and production scheduling with earliness/tardiness penalties. In this problem, decisions about lot-sizing and scheduling are made so that the sum of holding, tardiness, and setup costs is minimized. There are n orders waiting to be processed on a machine. Each order has its own due date as well as tardiness and earliness cost being the same as holding cost .Each order is delivered only once. If the production is completed before or on the due date, delivery will be on the due date. Otherwise, the order will be delivered immediately after its production is completed. In spite of its wide applications, this problem has not yet been reported in the literature. A ma...
Part 5: Scheduling in Manufacturing and Other ApplicationsInternational audienceIn this paper we are...
International audienceA problem of lot-sizing and sequencing several products on a single machine is...
This paper deals with the multi-product, finite horizon, static demand, sequencing, lot sizing and s...
This paper addresses a production scheduling problem in a single-machine environment, where a job ca...
In this research, the single machine capacitated lot-sizing and scheduling problem with sequence- de...
International audienceThis article studies a problem of optimal scheduling and lot sizing a number o...
International audienceThis article studies a problem of optimal scheduling and lot sizing a number o...
The single-stage simultaneous lot sizing and scheduling problem was the object of study in this work...
Economic lot scheduling problem (ELSP) is related to lot-sizing and scheduling several items in a si...
Typescript (photocopy).One of major decisions which firms must face is to determine when and how muc...
The Economic Lot Scheduling Problem (ELSP) on a single facility (or machine) with the time-varying l...
Typescript (photocopy).One of major decisions which firms must face is to determine when and how muc...
The Capacitated Lot Sizing Problem (CLSP) consists of planning the lot sizes of multiple items over ...
We consider the discrete single-machine, multi-item lot-sizing and scheduling problem and we propose...
This paper presents a novel mathematical programming approach to the single-machine capacitated lot-...
Part 5: Scheduling in Manufacturing and Other ApplicationsInternational audienceIn this paper we are...
International audienceA problem of lot-sizing and sequencing several products on a single machine is...
This paper deals with the multi-product, finite horizon, static demand, sequencing, lot sizing and s...
This paper addresses a production scheduling problem in a single-machine environment, where a job ca...
In this research, the single machine capacitated lot-sizing and scheduling problem with sequence- de...
International audienceThis article studies a problem of optimal scheduling and lot sizing a number o...
International audienceThis article studies a problem of optimal scheduling and lot sizing a number o...
The single-stage simultaneous lot sizing and scheduling problem was the object of study in this work...
Economic lot scheduling problem (ELSP) is related to lot-sizing and scheduling several items in a si...
Typescript (photocopy).One of major decisions which firms must face is to determine when and how muc...
The Economic Lot Scheduling Problem (ELSP) on a single facility (or machine) with the time-varying l...
Typescript (photocopy).One of major decisions which firms must face is to determine when and how muc...
The Capacitated Lot Sizing Problem (CLSP) consists of planning the lot sizes of multiple items over ...
We consider the discrete single-machine, multi-item lot-sizing and scheduling problem and we propose...
This paper presents a novel mathematical programming approach to the single-machine capacitated lot-...
Part 5: Scheduling in Manufacturing and Other ApplicationsInternational audienceIn this paper we are...
International audienceA problem of lot-sizing and sequencing several products on a single machine is...
This paper deals with the multi-product, finite horizon, static demand, sequencing, lot sizing and s...