The PS2 will replace the present CERN-PS in the cascade of LHC injectors. It will have twice the PS energy and twice the circumference. Extensive design optimization is presently ongoing to prepare a conceptual design report for project approval in 2012, with the aim of starting construction in 2013. The paper describes the various PS2 design constraints, the optimization steps and the path towards the final design
The PS2 is proposed as a replacement for the ageing PS and will provide proton beams with kinetic en...
The integrated luminosity in the LHC experiments will directly depend upon the reliability and the l...
The primary goal of CERN and the Large Hadron Collider (LHC) community is to ensure that LHC is oper...
The PS2 is proposed as a replacement for the existing PS accelerator. It is presently considered to ...
CERN envisages replacing the existing Proton Synchrotron (PS) with a larger synchrotron (PS2) capabl...
Within the scope of the LHC injector upgrade it has been proposed to replace the present injector ch...
The replacement of CERN's existing 26 GeV Proton Synchrotron (PS) machine with a separated function ...
The replacement of CERN's existing 26 GeV Proton Synchrotron (PS) machine with a separated-function ...
Looking beyond the commissioning of the LHC, which is expected to start at the end of 2007, CERN is ...
Looking beyond the commissioning of the LHC, which is expected to start at the end of 2007, CERN is ...
The proposed new CERN injector chain LINAC4, SPL, PS2 will require the construction of new beam tran...
The proposed PS2 will accelerate protons from 4 to 50 GeV. The required beam intensity and brightnes...
This paper describes the basic parameters and the machine layout of the Low-Power SPL (LP-SPL), a 4G...
The LHC [1] will be supplied, via the SPS, with protons from the pre-injector chain comprising Linac...
The PS2 is proposed as a replacement for the ageing PS and will provide proton beams with kinetic en...
The PS2 is proposed as a replacement for the ageing PS and will provide proton beams with kinetic en...
The integrated luminosity in the LHC experiments will directly depend upon the reliability and the l...
The primary goal of CERN and the Large Hadron Collider (LHC) community is to ensure that LHC is oper...
The PS2 is proposed as a replacement for the existing PS accelerator. It is presently considered to ...
CERN envisages replacing the existing Proton Synchrotron (PS) with a larger synchrotron (PS2) capabl...
Within the scope of the LHC injector upgrade it has been proposed to replace the present injector ch...
The replacement of CERN's existing 26 GeV Proton Synchrotron (PS) machine with a separated function ...
The replacement of CERN's existing 26 GeV Proton Synchrotron (PS) machine with a separated-function ...
Looking beyond the commissioning of the LHC, which is expected to start at the end of 2007, CERN is ...
Looking beyond the commissioning of the LHC, which is expected to start at the end of 2007, CERN is ...
The proposed new CERN injector chain LINAC4, SPL, PS2 will require the construction of new beam tran...
The proposed PS2 will accelerate protons from 4 to 50 GeV. The required beam intensity and brightnes...
This paper describes the basic parameters and the machine layout of the Low-Power SPL (LP-SPL), a 4G...
The LHC [1] will be supplied, via the SPS, with protons from the pre-injector chain comprising Linac...
The PS2 is proposed as a replacement for the ageing PS and will provide proton beams with kinetic en...
The PS2 is proposed as a replacement for the ageing PS and will provide proton beams with kinetic en...
The integrated luminosity in the LHC experiments will directly depend upon the reliability and the l...
The primary goal of CERN and the Large Hadron Collider (LHC) community is to ensure that LHC is oper...