The transfer line for the LHC Ring 1 was successfully commissioned with beam in the autumn of 2007. After extraction from the SPS accelerator and about 2.7 km of new transfer line, the beam arrived at the temporarily installed beam dump, about 50 m before the start of the LHC tunnel, without the need of any beam threading. This paper gives an overview of the hardware commissioning period and the actual beam tests carried out. It summarises the results of the beam test optics measurements and the performance of the installed hardware
The status of the ongoing Large Hadron Collider (LHC) installation is described with particular atte...
Image of the first beam spot on the last BTV screen traversed by the beam during the TI 2 test
A series of LHC injection tests was performed in August and September 2008. The first saw beam injec...
The transfer line for the LHC Ring 1 was successfully commissioned with beam in the autumn of 2007. ...
The LHC injection tests and first turn beam commissioning took place in late summer 2008, after deta...
Through May to September 2008, further beam commissioning of the SPS-to-LHC transfer lines was perfo...
The transfer lines for both rings of the LHC were successfully re-commissioned with beam in preparat...
Transfer of 450 GeV protons from SPS to LHC will be carried out through two new beam transfer lines ...
The new TI8 transfer-line between the SPS and the future LHC was commissioned during two long machin...
The new fast extraction system in LSS6 of the SPS and the first 100 m of transfer line TT60 was comm...
Following a series of injection tests, the first attempts to pass beam around both directions of the...
Beam commissioning of the SPS to LHC transfer lines performed during the summer 2008 is reported. Th...
The installation of the two Large Hadron Collider (LHC) injection lines has to fit within tight mile...
The LHC at CERN is in its final installation phase and hardware commissioning has started in 2006. T...
The status of the ongoing LHC installation is reported with some attention given to the long straigh...
The status of the ongoing Large Hadron Collider (LHC) installation is described with particular atte...
Image of the first beam spot on the last BTV screen traversed by the beam during the TI 2 test
A series of LHC injection tests was performed in August and September 2008. The first saw beam injec...
The transfer line for the LHC Ring 1 was successfully commissioned with beam in the autumn of 2007. ...
The LHC injection tests and first turn beam commissioning took place in late summer 2008, after deta...
Through May to September 2008, further beam commissioning of the SPS-to-LHC transfer lines was perfo...
The transfer lines for both rings of the LHC were successfully re-commissioned with beam in preparat...
Transfer of 450 GeV protons from SPS to LHC will be carried out through two new beam transfer lines ...
The new TI8 transfer-line between the SPS and the future LHC was commissioned during two long machin...
The new fast extraction system in LSS6 of the SPS and the first 100 m of transfer line TT60 was comm...
Following a series of injection tests, the first attempts to pass beam around both directions of the...
Beam commissioning of the SPS to LHC transfer lines performed during the summer 2008 is reported. Th...
The installation of the two Large Hadron Collider (LHC) injection lines has to fit within tight mile...
The LHC at CERN is in its final installation phase and hardware commissioning has started in 2006. T...
The status of the ongoing LHC installation is reported with some attention given to the long straigh...
The status of the ongoing Large Hadron Collider (LHC) installation is described with particular atte...
Image of the first beam spot on the last BTV screen traversed by the beam during the TI 2 test
A series of LHC injection tests was performed in August and September 2008. The first saw beam injec...