This paper evaluates the utilization of Remote Direct Memory Access (RDMA) over Converged Ethernet (RoCE) for the Run 3 LHCb event building at CERN. The acquisition system of the detector will collect partial data from approximately 1000 separate detector streams. The total estimated throughput equals 32 Terabits per second. Full events will be assembled for subsequent processing and data selection in the filtering farm of the online trigger. High-throughput transmissions with up to 90% links utilization will be an essential feature of the system. The data exchange mechanism must support zero-copy transmissions. In this work, the RoCE high-throughput kernel bypass Ethernet protocol is benchmarked as a potential alternative to InfiniBand. A ...
The ATLAS experiment Data Acquisition (DAQ) system will face an extensive upgrade to fully exploit t...
The LHCb Collaboration is preparing a major upgrade of the detector and the Data Acquisition (DAQ) t...
The LHCb experiment will undergo a major upgrade during the second long shutdown (2018–2019), aiming...
This paper evaluates the utilization of Remote Direct Memory Access (RDMA) over Converged Ethernet (...
This paper evaluates the utilization of RDMA over Converged Ethernet (RoCE) for the Run3 LHCb event ...
This paper evaluates the real-time distribution of data over Ethernet for the upgraded LHCb data acq...
The LHCb experiment [1] will be upgraded in 2018–2019 to change its operation to a triggerless full-...
We report on performance measurements and optimizations of the event-builder software for the CMS ex...
The Data Acquisition (DAQ) system of LHCb is a complex real-time system. It will be upgraded to prov...
We report on measurements performed to test the reliability of high rate data transmission over copp...
The LHCb experiment will be upgraded in 2021, and a new triggerless readout system will be implement...
LHCb is an experiment being constructed at CERN's LHC accelerator for the purpose of studying precis...
The first level trigger of LHCb accepts one million events per second. After preprocessing in custom...
The LHCb event-builder is implemented using a large Gigabit Ethernet network using a push-protocol f...
The Data Acquisition (DAQ) of the LHCb experiment[1] will be upgraded in 2020 to a high-bandwidth tr...
The ATLAS experiment Data Acquisition (DAQ) system will face an extensive upgrade to fully exploit t...
The LHCb Collaboration is preparing a major upgrade of the detector and the Data Acquisition (DAQ) t...
The LHCb experiment will undergo a major upgrade during the second long shutdown (2018–2019), aiming...
This paper evaluates the utilization of Remote Direct Memory Access (RDMA) over Converged Ethernet (...
This paper evaluates the utilization of RDMA over Converged Ethernet (RoCE) for the Run3 LHCb event ...
This paper evaluates the real-time distribution of data over Ethernet for the upgraded LHCb data acq...
The LHCb experiment [1] will be upgraded in 2018–2019 to change its operation to a triggerless full-...
We report on performance measurements and optimizations of the event-builder software for the CMS ex...
The Data Acquisition (DAQ) system of LHCb is a complex real-time system. It will be upgraded to prov...
We report on measurements performed to test the reliability of high rate data transmission over copp...
The LHCb experiment will be upgraded in 2021, and a new triggerless readout system will be implement...
LHCb is an experiment being constructed at CERN's LHC accelerator for the purpose of studying precis...
The first level trigger of LHCb accepts one million events per second. After preprocessing in custom...
The LHCb event-builder is implemented using a large Gigabit Ethernet network using a push-protocol f...
The Data Acquisition (DAQ) of the LHCb experiment[1] will be upgraded in 2020 to a high-bandwidth tr...
The ATLAS experiment Data Acquisition (DAQ) system will face an extensive upgrade to fully exploit t...
The LHCb Collaboration is preparing a major upgrade of the detector and the Data Acquisition (DAQ) t...
The LHCb experiment will undergo a major upgrade during the second long shutdown (2018–2019), aiming...