The status of the construction and installation of the CMS detector is reviewed. The 4T magnet is cold since end of February. Its commissioning up to the nominal field started in July allowing data taking with cosmics in which elements of the final detector are involved. All big mechanical pieces equipped with muons chambers have been assembled in the surface hall SX5. Since mid July the detector is closed with commissioned HCAL, 2 ECAL supermodules and representative elements of the silicon tracker. The trigger system as well as the DAQ are tested with cosmics. After the completion of the physics TDR, CMS is now ready for the promising signal hunting
During the second half of 2006 a first combined test of almost all sub-systems of the Compact Muon S...
The CMS experiment was completely assembled in the fall of 2008 after a decade of design, constructi...
The CMS experiment was completely assembled in the fall of 2008 after a decade of design, constructi...
International audienceThe status of the construction and installation of the CMS detector is reviewe...
International audienceThe status of the construction and installation of the CMS detector is reviewe...
International audienceThe status of the construction and installation of the CMS detector is reviewe...
International audienceThe status of the construction and installation of the CMS detector is reviewe...
International audienceThe status of the construction and installation of the CMS detector is reviewe...
The construction status of the CMS experiment at the Large Hadron Collider and strategies for commis...
The status of the installation of the detectors for the CMS experiment and the global commissioning ...
After a brief overview of the Compact Muon Solenoid (CMS) experiment, the status of construction and...
The Compact Muon Solenoid Detector (CMS) completed the first phase of commissioning in September 200...
The CMS detector is under construction for imminent operation at the Large Hadron Collider at CERN n...
AbstractThe Compact Muon Solenoid (CMS) detector is one of the two largest and most powerful particl...
After a brief overview of the Compact Muon Solenoid (CMS) experiment, the status of construction, in...
During the second half of 2006 a first combined test of almost all sub-systems of the Compact Muon S...
The CMS experiment was completely assembled in the fall of 2008 after a decade of design, constructi...
The CMS experiment was completely assembled in the fall of 2008 after a decade of design, constructi...
International audienceThe status of the construction and installation of the CMS detector is reviewe...
International audienceThe status of the construction and installation of the CMS detector is reviewe...
International audienceThe status of the construction and installation of the CMS detector is reviewe...
International audienceThe status of the construction and installation of the CMS detector is reviewe...
International audienceThe status of the construction and installation of the CMS detector is reviewe...
The construction status of the CMS experiment at the Large Hadron Collider and strategies for commis...
The status of the installation of the detectors for the CMS experiment and the global commissioning ...
After a brief overview of the Compact Muon Solenoid (CMS) experiment, the status of construction and...
The Compact Muon Solenoid Detector (CMS) completed the first phase of commissioning in September 200...
The CMS detector is under construction for imminent operation at the Large Hadron Collider at CERN n...
AbstractThe Compact Muon Solenoid (CMS) detector is one of the two largest and most powerful particl...
After a brief overview of the Compact Muon Solenoid (CMS) experiment, the status of construction, in...
During the second half of 2006 a first combined test of almost all sub-systems of the Compact Muon S...
The CMS experiment was completely assembled in the fall of 2008 after a decade of design, constructi...
The CMS experiment was completely assembled in the fall of 2008 after a decade of design, constructi...