With the rapid development of urbanization, the speed of constructing urban underground space and ground foundation engineering is accelerated. With the shortage of land resources, the distance between underground engineering and surface engineering is getting closer and closer, and the contradictions and problems between projects are becoming more and more serious. Based on the new subway station, this paper passes the existing urban viaduct in a short distance. The settlement and deformation of pile foundation and buildings caused by the excavation of the subway station is studied by using ROCSCIENCE software and site monitoring method. The potential risk sources around the station are pile foundations 18.5 m away, residential buildings 1...
The excavation of a foundation pit considerably affects the adjacent structures and underground pipe...
This paper presents a case history of the developmental effect of a large-area excavation, 8 high-ri...
It is an effective approach to use Steel Tube Slab (STS) structure combined with the Pile-Beam-Arch ...
With the large-scale development and utilization of underground space projects, the subway-led Rail ...
Due to soil disturbance during the construction of metro stations, the initial stress of the stratum...
Building deformations are not only closely related to the distance from the building to metro-statio...
The main challenge for metro station construction is to ensure the construction schedule while minim...
As an important part of subway transfer station construction, pit-in-pit (PIP) excavation has always...
Response of buried pipeline to tunnelling is of great concern in the subway construction. It is of p...
With the large-scale construction of city subways, the down traversing formed by subway running tunn...
The excavation depth of a deep and large foundation pit of a composite support system is 25.5 m, the...
In the process of urban rail transit construction, underground excavation method is often used in su...
Construction of subway line intersection stations will become more and more popular in the future. R...
Based on the sand and pebble stratum in the Beijing area, this paper studies the interaction between...
A new construction pre-supporting system, Steel Tube Slab system (STS), is proposed for large underg...
The excavation of a foundation pit considerably affects the adjacent structures and underground pipe...
This paper presents a case history of the developmental effect of a large-area excavation, 8 high-ri...
It is an effective approach to use Steel Tube Slab (STS) structure combined with the Pile-Beam-Arch ...
With the large-scale development and utilization of underground space projects, the subway-led Rail ...
Due to soil disturbance during the construction of metro stations, the initial stress of the stratum...
Building deformations are not only closely related to the distance from the building to metro-statio...
The main challenge for metro station construction is to ensure the construction schedule while minim...
As an important part of subway transfer station construction, pit-in-pit (PIP) excavation has always...
Response of buried pipeline to tunnelling is of great concern in the subway construction. It is of p...
With the large-scale construction of city subways, the down traversing formed by subway running tunn...
The excavation depth of a deep and large foundation pit of a composite support system is 25.5 m, the...
In the process of urban rail transit construction, underground excavation method is often used in su...
Construction of subway line intersection stations will become more and more popular in the future. R...
Based on the sand and pebble stratum in the Beijing area, this paper studies the interaction between...
A new construction pre-supporting system, Steel Tube Slab system (STS), is proposed for large underg...
The excavation of a foundation pit considerably affects the adjacent structures and underground pipe...
This paper presents a case history of the developmental effect of a large-area excavation, 8 high-ri...
It is an effective approach to use Steel Tube Slab (STS) structure combined with the Pile-Beam-Arch ...