The CERN SPS receives beams from the CPS by the continuous transfer process. The authors outline the role of a modulated fast bump in this process and describes the magnets and pulse generators which produce it. Particular attention is given to the high voltage staircase pulse generator which determines the degree of modulation of the bump. Operating experience since the start of SPS commissioning is reported. (1 refs)
As part of the LHC Injector Upgrade (LIU) project, the production of a high-intensity proton beam in...
The beam transfer from the Proton Synchrotron (PS) to the Super Proton Synchrotron (SPS) at CERN is ...
The vertical beam dump system of the CERN Super Proton Synchrotron (SPS) uses two matched magnets wi...
Describes three new pulse generator systems for the excitation of the kicker magnets of fast ejectio...
The paper describes in its first part the design of a prototype pulse generator for the new inflecto...
The CERN PS complex (CPS) comprises three accelerators in series: the 50 MeV Linac, the 800 MeV Boos...
In order to prevent uncontrolled beam losses in the Super Proton Synchrotron (SPS) at CERN, which ca...
A circuit producing a pulse of over 100 A and a width programmable from 2 to 16 ms has been develope...
An upgrade program for increasing the stored beam current in the Proton Storage is presently under w...
Within the scope of the LIU project the CERN PS Booster to PS beam transfer will be modified to matc...
The SPS (Super Proton Synchrotron) is designed to take protons from the existing proton synchrotron,...
A five-turn continuous extraction has up to now been used to transfer the proton beam from the CERN ...
A fast shaving ejection during 10 or 11 turns is the most promising system for the transfer of the C...
CERN is constructing the Large Hadron Collider (LHC), a superconducting accelerator that will collid...
The CERN Proton Synchrotron complex (CPS) has been operational for over 50 years. During this time t...
As part of the LHC Injector Upgrade (LIU) project, the production of a high-intensity proton beam in...
The beam transfer from the Proton Synchrotron (PS) to the Super Proton Synchrotron (SPS) at CERN is ...
The vertical beam dump system of the CERN Super Proton Synchrotron (SPS) uses two matched magnets wi...
Describes three new pulse generator systems for the excitation of the kicker magnets of fast ejectio...
The paper describes in its first part the design of a prototype pulse generator for the new inflecto...
The CERN PS complex (CPS) comprises three accelerators in series: the 50 MeV Linac, the 800 MeV Boos...
In order to prevent uncontrolled beam losses in the Super Proton Synchrotron (SPS) at CERN, which ca...
A circuit producing a pulse of over 100 A and a width programmable from 2 to 16 ms has been develope...
An upgrade program for increasing the stored beam current in the Proton Storage is presently under w...
Within the scope of the LIU project the CERN PS Booster to PS beam transfer will be modified to matc...
The SPS (Super Proton Synchrotron) is designed to take protons from the existing proton synchrotron,...
A five-turn continuous extraction has up to now been used to transfer the proton beam from the CERN ...
A fast shaving ejection during 10 or 11 turns is the most promising system for the transfer of the C...
CERN is constructing the Large Hadron Collider (LHC), a superconducting accelerator that will collid...
The CERN Proton Synchrotron complex (CPS) has been operational for over 50 years. During this time t...
As part of the LHC Injector Upgrade (LIU) project, the production of a high-intensity proton beam in...
The beam transfer from the Proton Synchrotron (PS) to the Super Proton Synchrotron (SPS) at CERN is ...
The vertical beam dump system of the CERN Super Proton Synchrotron (SPS) uses two matched magnets wi...