A detailed description of the CERN BEBC 35 (22 visible) m/sup 3/ bubble chamber, with a 3.5T (730 MJ) superconducting magnetic field system, is given. (9 refs)
bird's-eye view of CERN, Civil engineering workson Big European Bubble Chamber (BEBC), Intersecting ...
bird's-eye view of CERN, Civil engineering workson Big European Bubble Chamber (BEBC), Intersecting ...
bird's-eye view of CERN, Civil engineering workson Big European Bubble Chamber (BEBC), Intersecting ...
A view of the dismantling of the magnet of BEBC, the 3.7 m European Bubble Chamber : iron magnetic s...
The vessel of the Big European Bubble Chamber, BEBC, was installed at the beginning of the 1970s. Th...
The CERN Heavy liquid bubble chamber being installed in the north experimental hall at the PS. On th...
The superconducting coils of the magnet for the 3.7 m Big European Bubble Chamber (BEBC) had to be c...
Reviews the current status of large cryogenic bubble chambers. Specific references are made to the A...
Some of the physical aspects of the program of exploitation of the CERN BEBC are discussed, with par...
For the identification of muons behind the Big European Bubble Chamber (BEBC) a detector wall of 6 m...
The superconducting magnet of the Big European Bubble Chamber (BEBC) has been excited with currents ...
Under assembly are : front, the 150 cm British Chamber and at far end the CERN 2-metre chamber
In July 1967, the CERN-France-Federal Republic of Germany agreement on construction of the BEBC was ...
The 3.70 metre Big European Bubble Chamber (BEBC) was dismantled on 9 August 1984. One of the bigges...
The CERN Heavy liquid bubble chamber in its new position (centre right) in series with 2 m liquid hy...
bird's-eye view of CERN, Civil engineering workson Big European Bubble Chamber (BEBC), Intersecting ...
bird's-eye view of CERN, Civil engineering workson Big European Bubble Chamber (BEBC), Intersecting ...
bird's-eye view of CERN, Civil engineering workson Big European Bubble Chamber (BEBC), Intersecting ...
A view of the dismantling of the magnet of BEBC, the 3.7 m European Bubble Chamber : iron magnetic s...
The vessel of the Big European Bubble Chamber, BEBC, was installed at the beginning of the 1970s. Th...
The CERN Heavy liquid bubble chamber being installed in the north experimental hall at the PS. On th...
The superconducting coils of the magnet for the 3.7 m Big European Bubble Chamber (BEBC) had to be c...
Reviews the current status of large cryogenic bubble chambers. Specific references are made to the A...
Some of the physical aspects of the program of exploitation of the CERN BEBC are discussed, with par...
For the identification of muons behind the Big European Bubble Chamber (BEBC) a detector wall of 6 m...
The superconducting magnet of the Big European Bubble Chamber (BEBC) has been excited with currents ...
Under assembly are : front, the 150 cm British Chamber and at far end the CERN 2-metre chamber
In July 1967, the CERN-France-Federal Republic of Germany agreement on construction of the BEBC was ...
The 3.70 metre Big European Bubble Chamber (BEBC) was dismantled on 9 August 1984. One of the bigges...
The CERN Heavy liquid bubble chamber in its new position (centre right) in series with 2 m liquid hy...
bird's-eye view of CERN, Civil engineering workson Big European Bubble Chamber (BEBC), Intersecting ...
bird's-eye view of CERN, Civil engineering workson Big European Bubble Chamber (BEBC), Intersecting ...
bird's-eye view of CERN, Civil engineering workson Big European Bubble Chamber (BEBC), Intersecting ...