In an investigation of the efficiency of the calcium/ferric phosphate process for removal of various radio-isotopes from solution using a sludge blanket clarifier 70 per cent, removal of uranyl and strontium ions and mixed fission products was achieved but cesium removal was poor, in agreement with other workers. Dosing ion concentrations were 80 p.p.m. PO4---, 50 p.p.m. Ca++ and 40 p.p.m. Fe+++, used at an initial pH of 11.5. Use of a lower concentration and lower pH values did not materially affect removals. In batch experiments to find the optimum concentration of ions for precipitation at a pH of 9.5 it was found that concentrationsof 90 p.p.m. PO4---, 50 p.p.m. Ca++ and 40 p.p.m. Fe+++ leave very small residual concentrations in the su...
This paper presents the results of pilot-plant scale investigation of the feasibility of removing ca...
The report formulates the experiments conducted to remove phosphorus from the return sludge wastewat...
The objectives of this project are to determine the feasibility of and develop optimum conditions fo...
A scavenging-precipitation ion-exchange process using phenolic resins was developed to decontaminate...
Calcium-magnesium precipitation apparatus was used to reduce the concentrations of these elements in...
The heavy burden of nuclear waste is currently the driver for the development of advanced technologi...
A waste stream decontamination process based on ion exchange was selected for development. The proce...
A preliminary investigation has been conducted to determine the conditions for the precipitation of ...
It is well known that in the Hungarian PWR-type nuclear power plant Paks the radioactive waste water...
The removal of strontium-90 and cesium-137 from fuel storage basin effluent by ion exchange using th...
This article presented two-staged chemical precipitation for radioactive wastewater decontamination ...
The work reported in this document is a series of statistically designed tests to examine the relati...
Decommissioning high level nuclear waste tanks will leave small amounts of residual sludge clinging ...
Of the various dissolved species contained in the effluents from the mining and milling of uranium o...
Standard waste treatment procedures for the removal of {sup 90}Sr and {sup 137}Cs from contaminated ...
This paper presents the results of pilot-plant scale investigation of the feasibility of removing ca...
The report formulates the experiments conducted to remove phosphorus from the return sludge wastewat...
The objectives of this project are to determine the feasibility of and develop optimum conditions fo...
A scavenging-precipitation ion-exchange process using phenolic resins was developed to decontaminate...
Calcium-magnesium precipitation apparatus was used to reduce the concentrations of these elements in...
The heavy burden of nuclear waste is currently the driver for the development of advanced technologi...
A waste stream decontamination process based on ion exchange was selected for development. The proce...
A preliminary investigation has been conducted to determine the conditions for the precipitation of ...
It is well known that in the Hungarian PWR-type nuclear power plant Paks the radioactive waste water...
The removal of strontium-90 and cesium-137 from fuel storage basin effluent by ion exchange using th...
This article presented two-staged chemical precipitation for radioactive wastewater decontamination ...
The work reported in this document is a series of statistically designed tests to examine the relati...
Decommissioning high level nuclear waste tanks will leave small amounts of residual sludge clinging ...
Of the various dissolved species contained in the effluents from the mining and milling of uranium o...
Standard waste treatment procedures for the removal of {sup 90}Sr and {sup 137}Cs from contaminated ...
This paper presents the results of pilot-plant scale investigation of the feasibility of removing ca...
The report formulates the experiments conducted to remove phosphorus from the return sludge wastewat...
The objectives of this project are to determine the feasibility of and develop optimum conditions fo...