To date, group scheduling research has primarily focused on examining the performance of different group heuristics under various experimental conditions. However, the dynamic selection of group heuristics has not received sufficient attention from researchers. The objective of this paper is to demonstrate a mechanism for the dynamic selection of group heuristics from several candidate alternatives by exploiting real time information from the Flexible Manufacturing System (FMS). In this regard, two tools, viz., Analytic Hierarchy Process (AHP) and Simple Multi-Attribute Rating Technique Exploiting Ranks (SMARTER), are used to develop models for part type and family selection. The experimental results indicate that the performance of the pro...
Despite the existence of hardware suitable for the development of advanced automated manufacturing s...
This paper addresses the flexible manufacturing system (FMS) problems considering both machines and ...
A production system that is constructed by multiple production lines, machines, single or multi-stag...
The complete scheduling of FMS includes two independent processes: sequencing of jobs and scheduling...
In recent years there has been an increased interest in automated and Flexible Manufacturing Systems...
Flexible manufacturing systems (FMS) have already proved their great success in a large number of ma...
The paper studies the scheduling problem in a Flexible Manufacturing System (FMS) operating under un...
International audienceIn the field of predictive-reactive scheduling methods, group sequencing is re...
The dynamic part type selection problem for mid-term scheduling to maximize profit over time in a ge...
International audienceWe are interested in jobs scheduling in flexible manufacturing systems. We try...
The paper studies the scheduling problem in a Flexible Manufacturing System (FMS) operating under un...
The paper studies the scheduling problem in a Flexible Manufacturing System (FMS) operating under un...
In this paper, an on-line dispatching algorithm is proposed for the FMS scheduling problem. The algo...
Flexible manufacturing system (FMS) scheduling problems become extremely complex when it comes to ac...
International audienceIn the field of predictive-reactive scheduling methods, group sequencing is re...
Despite the existence of hardware suitable for the development of advanced automated manufacturing s...
This paper addresses the flexible manufacturing system (FMS) problems considering both machines and ...
A production system that is constructed by multiple production lines, machines, single or multi-stag...
The complete scheduling of FMS includes two independent processes: sequencing of jobs and scheduling...
In recent years there has been an increased interest in automated and Flexible Manufacturing Systems...
Flexible manufacturing systems (FMS) have already proved their great success in a large number of ma...
The paper studies the scheduling problem in a Flexible Manufacturing System (FMS) operating under un...
International audienceIn the field of predictive-reactive scheduling methods, group sequencing is re...
The dynamic part type selection problem for mid-term scheduling to maximize profit over time in a ge...
International audienceWe are interested in jobs scheduling in flexible manufacturing systems. We try...
The paper studies the scheduling problem in a Flexible Manufacturing System (FMS) operating under un...
The paper studies the scheduling problem in a Flexible Manufacturing System (FMS) operating under un...
In this paper, an on-line dispatching algorithm is proposed for the FMS scheduling problem. The algo...
Flexible manufacturing system (FMS) scheduling problems become extremely complex when it comes to ac...
International audienceIn the field of predictive-reactive scheduling methods, group sequencing is re...
Despite the existence of hardware suitable for the development of advanced automated manufacturing s...
This paper addresses the flexible manufacturing system (FMS) problems considering both machines and ...
A production system that is constructed by multiple production lines, machines, single or multi-stag...