"October, 1978." Caption title.Bibliography: leaf 6.Supported by the National Science Foundation under Grant no. NSF/RANN APR76-12036S.B. Gershwin, I.C. Schick
Probabilistic processing times, times between breakdowns and repair times make the amount of stock i...
Production system engineering is strongly relied on mathematical models of systems under considerati...
Abstract approved: The optimal allocation of buffers in serial production systems is one of the olde...
Bibliography: leaves 29-31.Research supported by National Science Foundation Grants NSF/RANN APR76-1...
Material \ufb02ow along a Flow Production Line may be disrupted by machine failures or variable proc...
Each v. has also a distinctive title.Report covers June 1, 1976-July 31, 1978.National Science Found...
In automatic production systems, the size of intermediate buffers, significantly affects the success...
In automatic production systems, the size of intermediate buffers, significantly affects the success...
Cataloged from PDF version of article.In this paper we consider asynchronous serial lines in which W...
The buffer allocation problem concerning the size and location of storage between the stages of a fl...
In this paper, a simple optimal buffer capacity model is developed for series production line where ...
Thesis (M.S.)--Wichita State University, College of Engineering, Dept. of Industrial and Manufacturi...
A key problem in transfer line design is that of determining what size should be assigned to interme...
This thesis addresses the problem of buffer capacity allocation in serial production lines. Both in-...
Most production lines keep a minimal level of inventory stock to save storage costs and buffer space...
Probabilistic processing times, times between breakdowns and repair times make the amount of stock i...
Production system engineering is strongly relied on mathematical models of systems under considerati...
Abstract approved: The optimal allocation of buffers in serial production systems is one of the olde...
Bibliography: leaves 29-31.Research supported by National Science Foundation Grants NSF/RANN APR76-1...
Material \ufb02ow along a Flow Production Line may be disrupted by machine failures or variable proc...
Each v. has also a distinctive title.Report covers June 1, 1976-July 31, 1978.National Science Found...
In automatic production systems, the size of intermediate buffers, significantly affects the success...
In automatic production systems, the size of intermediate buffers, significantly affects the success...
Cataloged from PDF version of article.In this paper we consider asynchronous serial lines in which W...
The buffer allocation problem concerning the size and location of storage between the stages of a fl...
In this paper, a simple optimal buffer capacity model is developed for series production line where ...
Thesis (M.S.)--Wichita State University, College of Engineering, Dept. of Industrial and Manufacturi...
A key problem in transfer line design is that of determining what size should be assigned to interme...
This thesis addresses the problem of buffer capacity allocation in serial production lines. Both in-...
Most production lines keep a minimal level of inventory stock to save storage costs and buffer space...
Probabilistic processing times, times between breakdowns and repair times make the amount of stock i...
Production system engineering is strongly relied on mathematical models of systems under considerati...
Abstract approved: The optimal allocation of buffers in serial production systems is one of the olde...