Abstract A modified particle swarm optimization (PSO) approach is presented for the multi‐mode resource‐constrained scheduling problem of automated guided vehicle (AGV) tasks. Various constraints in the scheduling process of the AGV system are analysed, and the types and quantities of AGVs as allocable resources are considered. The multiple‐AGV combined distribution mode and its impact on distribution tasks is also considered. Finally, a multi‐mode resource‐constrained task scheduling model is established for which the object is to minimise material delivery time. Based on the above model, the discrete particle swarm optimization algorithm that improved the basic PSO was proposed. The simulation results with the test set in PSPLIB standard ...
Intelligent mobile robots belong to advanced material handling systems that are finding increasing a...
Nowadays, automated guided vehicles (AGVs) are frequently used in larger systems, known as AGV-based...
Aiming at the logistics dynamic scheduling problem in an intelligent manufacturing workshop (IMW), a...
Flexible manufacturing system (FMS) enhances the firm's flexibility and responsiveness to the ever-c...
Flexible manufacturing system (FMS) enhances the firm's flexibility and responsiveness to the ever-c...
An automated guided vehicle (AGV) is a mobile robot with remarkable industrial applicability for tra...
Efficiency in management of the material handling system plays an important role in planning and ope...
Aimed at the problem of the green scheduling problem with automated guided vehicles (AGVs) in flexib...
AbstractOptimum Automated Guided Vehicles (AGVs) operation plays a crucial role in improving the per...
An efficient and optimized Automated Guided Vehicles (AGVs) operation plays a critical role in impr...
Dispatching automated guided vehicles (AGVs) is the common approach for AGVs scheduling in practice,...
This paper explores deep into the collaborative scheduling of common rail dual automatic guided vehi...
An AGV system can be used to transport different-size materials in an assembly line. The hybrid task...
AGV-based automated guided vehicles (AGVs) are used in the Flexible Manufacturing System (FMS), whic...
In order to improve the sorting efficiency of automatic guided vehicle (AGV) in the logistics sortin...
Intelligent mobile robots belong to advanced material handling systems that are finding increasing a...
Nowadays, automated guided vehicles (AGVs) are frequently used in larger systems, known as AGV-based...
Aiming at the logistics dynamic scheduling problem in an intelligent manufacturing workshop (IMW), a...
Flexible manufacturing system (FMS) enhances the firm's flexibility and responsiveness to the ever-c...
Flexible manufacturing system (FMS) enhances the firm's flexibility and responsiveness to the ever-c...
An automated guided vehicle (AGV) is a mobile robot with remarkable industrial applicability for tra...
Efficiency in management of the material handling system plays an important role in planning and ope...
Aimed at the problem of the green scheduling problem with automated guided vehicles (AGVs) in flexib...
AbstractOptimum Automated Guided Vehicles (AGVs) operation plays a crucial role in improving the per...
An efficient and optimized Automated Guided Vehicles (AGVs) operation plays a critical role in impr...
Dispatching automated guided vehicles (AGVs) is the common approach for AGVs scheduling in practice,...
This paper explores deep into the collaborative scheduling of common rail dual automatic guided vehi...
An AGV system can be used to transport different-size materials in an assembly line. The hybrid task...
AGV-based automated guided vehicles (AGVs) are used in the Flexible Manufacturing System (FMS), whic...
In order to improve the sorting efficiency of automatic guided vehicle (AGV) in the logistics sortin...
Intelligent mobile robots belong to advanced material handling systems that are finding increasing a...
Nowadays, automated guided vehicles (AGVs) are frequently used in larger systems, known as AGV-based...
Aiming at the logistics dynamic scheduling problem in an intelligent manufacturing workshop (IMW), a...