Typical missions identified for AMPS flights in the arly 1980's are described. Experiment objectives and typical scientific instruments selected to accomplish these objectives are discussed along with mission requirements and shuttle and Spacelab capabilities assessed to determine any AMPS unique requirements. Preliminary design concepts for the first two AMPS flights form the basis for the Phase C/D program plan. This plan implements flights 1 and 2 and indicates how both the scientific and flight support hardware can be systematically evolved for future AMPS flights
Guidelines and general requirements applicable to the development of instrument flight hardware inte...
Multidisciplined advanced planning studies were conducted that involve space operations and the asso...
The results of the Payload Specialist Station study are summarized. An optimum aft flight deck (AFD)...
Some 60 instrument candidates and 80 possible science investigations were evaluated. The early analy...
The results are presented of the AMPS Phase C/D (Design, Development, and Operations) program analys...
An equipment list, instrument baseline data, engineering drawings, mass properties computer printout...
The AMPS Program Specification delineates the AMPS Program requirements consistent with the resource...
The controls and displays (C&D) required at the Orbiter aft-flight deck (AFD) and the core C&D requi...
Space environment studies, astrophysics, Earth environment, life sciences, and material sciences are...
Major growth options for tended and manned space stations in LEO and GEO are examined including incr...
Engineering and operational facets associated with the implementation of the first two AMPS flights ...
The AMPS Flight 2 payload, its operation, and the support required from the Space Transportation Sys...
Planetary explorations, Earth observations, space physics, astronomy-astrophysics, solar physics, li...
The items identified as required to support the AMPS mission and requiring SR and T support and furt...
The design plan requirements define the design implementation and control requirements for Phase C/D...
Guidelines and general requirements applicable to the development of instrument flight hardware inte...
Multidisciplined advanced planning studies were conducted that involve space operations and the asso...
The results of the Payload Specialist Station study are summarized. An optimum aft flight deck (AFD)...
Some 60 instrument candidates and 80 possible science investigations were evaluated. The early analy...
The results are presented of the AMPS Phase C/D (Design, Development, and Operations) program analys...
An equipment list, instrument baseline data, engineering drawings, mass properties computer printout...
The AMPS Program Specification delineates the AMPS Program requirements consistent with the resource...
The controls and displays (C&D) required at the Orbiter aft-flight deck (AFD) and the core C&D requi...
Space environment studies, astrophysics, Earth environment, life sciences, and material sciences are...
Major growth options for tended and manned space stations in LEO and GEO are examined including incr...
Engineering and operational facets associated with the implementation of the first two AMPS flights ...
The AMPS Flight 2 payload, its operation, and the support required from the Space Transportation Sys...
Planetary explorations, Earth observations, space physics, astronomy-astrophysics, solar physics, li...
The items identified as required to support the AMPS mission and requiring SR and T support and furt...
The design plan requirements define the design implementation and control requirements for Phase C/D...
Guidelines and general requirements applicable to the development of instrument flight hardware inte...
Multidisciplined advanced planning studies were conducted that involve space operations and the asso...
The results of the Payload Specialist Station study are summarized. An optimum aft flight deck (AFD)...