The range of number of annual STS flights with 4- and 5-orbiter fleets was estimated and an overview of capabilities needed to support annual rates of 24 and up with a survey of known constraints and emphasis on External Tank (ET) production requirements was provided. Facility capability estimates are provided for ground turnaround, cargo handling, flight training and flight operations. Emphasizing the complexity of the STS systems and the R&D nature of present flight experience, it is concluded that the most prominent constraints in the early growth of the STS as an operational system may manifest themselves not as shortages of investment items such as the ET or SRB, but as inability to provide timely repairs or replacement of flight syste...
Current space policy limits the assignment of primary payloads on the Shuttle to those requiring man...
The space shuttle is discussed as a reusable space vehicle operated as a transportation system for s...
The cancellation of the Advanced Solid Rocket Booster Project and the earth-to-orbit payload require...
Reductions in expected STS flight rates of the Space Shuttle since the 51-L accident raise concerns ...
Space Shuttle chronology; Space Shuttle comparison; Cost comparison; Performance; Program ground rul...
The space shuttle performance capabilities and proposed space shuttle missions are discussed. The pe...
The design of the spacecraft is described. Focus is placed on the external tanks, the solid rocket b...
About 13 years ago, we launched the Space Shuttle. As launch vehicles go, its performance has been i...
The proposed studies on the space shuttle orbiter test taxi runs and captive flight tests were set f...
The space transportation system (STS) will be the principal means of launching USAF spacecraft begin...
A study for the selection of a low cost shuttle system for design and development was conducted. The...
A study is presented that identifies the potential performance capability of the production shuttle ...
A study was conducted to identify the differences among total system concepts of space shuttle confi...
Shuttle derivatives have been under study by the National Aeronautics and Space Administration (NASA...
Program options are defined and requirements are determined for integrating crew, mass, volume, and ...
Current space policy limits the assignment of primary payloads on the Shuttle to those requiring man...
The space shuttle is discussed as a reusable space vehicle operated as a transportation system for s...
The cancellation of the Advanced Solid Rocket Booster Project and the earth-to-orbit payload require...
Reductions in expected STS flight rates of the Space Shuttle since the 51-L accident raise concerns ...
Space Shuttle chronology; Space Shuttle comparison; Cost comparison; Performance; Program ground rul...
The space shuttle performance capabilities and proposed space shuttle missions are discussed. The pe...
The design of the spacecraft is described. Focus is placed on the external tanks, the solid rocket b...
About 13 years ago, we launched the Space Shuttle. As launch vehicles go, its performance has been i...
The proposed studies on the space shuttle orbiter test taxi runs and captive flight tests were set f...
The space transportation system (STS) will be the principal means of launching USAF spacecraft begin...
A study for the selection of a low cost shuttle system for design and development was conducted. The...
A study is presented that identifies the potential performance capability of the production shuttle ...
A study was conducted to identify the differences among total system concepts of space shuttle confi...
Shuttle derivatives have been under study by the National Aeronautics and Space Administration (NASA...
Program options are defined and requirements are determined for integrating crew, mass, volume, and ...
Current space policy limits the assignment of primary payloads on the Shuttle to those requiring man...
The space shuttle is discussed as a reusable space vehicle operated as a transportation system for s...
The cancellation of the Advanced Solid Rocket Booster Project and the earth-to-orbit payload require...