The main goal of the Jet Propulsion Laboratory (JPL) is to obtain science return from interplanetary probes. The uplink process is concerned with communicating commands to a spacecraft in order to achieve science objectives. There are two main parts to the development of the command file which is sent to a spacecraft. First, the activity planning process integrates the science requests for utilization of spacecraft time into a feasible sequence. Then the command generation process converts the sequence into a set of commands. The development of a feasible sequence plan is an expensive and labor intensive process requiring many months of effort. In order to save time and manpower in the uplink process, automation of parts of this process is ...
Attitude control is reviewed, encompassing the attitude control subsystem, spacecraft attitude preci...
The techniques required to produce and validate six detailed task timeline scenarios for crew worklo...
A set of construction and assembly tasks required on the lunar surface was developed, different conc...
This report describes the tasks performed and the progress made during Phase 1 of the DOE-NERI proje...
The purpose of the Reusable Reentry Satellite (RRS) Propulsion System Trade Study described in this ...
The Center for Space Construction (CSC) at the University of Colorado at Boulder is one of eight Uni...
A study was conducted to identify, rank, and define development plans for the critical guidance and ...
The separated flow method is evaluated. This method was developed for moderately swept wings with mu...
Lockheed personnel, along with team member subcontractors and consultants, have performed a prelimin...
This report contains information on the activities of the Artificial Intelligence Research Branch (F...
This report presents some of the challenging research and technology accomplished at NASA Ames Resea...
An architecture for the control of an autonomous aircraft is presented. The architecture is a hierar...
This document is a catalog and readers guide to lessons learned, experience, and technical history r...
Apollo 9 evasive maneuver after command service module/lunar module ejection from Saturn S-4B stage ...
The National Aeronautics and Space Administration (NASA) Commercial Crew Program (CCP) has been char...
Attitude control is reviewed, encompassing the attitude control subsystem, spacecraft attitude preci...
The techniques required to produce and validate six detailed task timeline scenarios for crew worklo...
A set of construction and assembly tasks required on the lunar surface was developed, different conc...
This report describes the tasks performed and the progress made during Phase 1 of the DOE-NERI proje...
The purpose of the Reusable Reentry Satellite (RRS) Propulsion System Trade Study described in this ...
The Center for Space Construction (CSC) at the University of Colorado at Boulder is one of eight Uni...
A study was conducted to identify, rank, and define development plans for the critical guidance and ...
The separated flow method is evaluated. This method was developed for moderately swept wings with mu...
Lockheed personnel, along with team member subcontractors and consultants, have performed a prelimin...
This report contains information on the activities of the Artificial Intelligence Research Branch (F...
This report presents some of the challenging research and technology accomplished at NASA Ames Resea...
An architecture for the control of an autonomous aircraft is presented. The architecture is a hierar...
This document is a catalog and readers guide to lessons learned, experience, and technical history r...
Apollo 9 evasive maneuver after command service module/lunar module ejection from Saturn S-4B stage ...
The National Aeronautics and Space Administration (NASA) Commercial Crew Program (CCP) has been char...
Attitude control is reviewed, encompassing the attitude control subsystem, spacecraft attitude preci...
The techniques required to produce and validate six detailed task timeline scenarios for crew worklo...
A set of construction and assembly tasks required on the lunar surface was developed, different conc...