A basic computerized technology is presented for estimating labor hours and cost of unmanned planetary and lunar programs. The user friendly methodology designated Labor Estimating Relationship/Cost Estimating Relationship (LERCER) organizes the forecasting process according to vehicle subsystem levels. The level of input variables required by the model in predicting cost is consistent with pre-Phase A type mission analysis. Twenty one program categories were used in the modeling. To develop the model, numerous LER and CER studies were surveyed and modified when required. The result of the research along with components of the LERCER program are reported
Military and civil space acquisitions have received much criticism for their inability to produce re...
Various methods of cost estimating are described. The method and benefits are presented of industria...
Accurate cost estimation for future work is important for ensuring that organizations have the perso...
A basic model is presented for estimating the cost of unmanned lunar and planetary programs. Cost da...
A manpower/cost estimation model is developed which is based on a detailed level of financial analys...
A mass and cost estimating computerized methology for predicting advanced manned space vehicle weigh...
The three main cost areas of unmanned satellite development are discussed. The areas are identified...
NASA is responsible for developing much of the nation's future space technology. Cost estimates for ...
The results are summarized of research accomplished during this period concerning planetary mission ...
An examination was made of early estimates of outer planetary atmospheric probe cost by comparing th...
A collection of scaling equations, weight statements, scaling factors, etc., useful for doing concep...
Cost-estimating relationships for small spacecraft have been shown to be significantly different fro...
The need for a predictive budget/funging model is obvious. The current models used by the Resource A...
The Mars Cost Tracking Model is a computer program that administers a system set up for tracking the...
Preliminary development cost estimate for Apollo project lunar mobile laboratory /Molab
Military and civil space acquisitions have received much criticism for their inability to produce re...
Various methods of cost estimating are described. The method and benefits are presented of industria...
Accurate cost estimation for future work is important for ensuring that organizations have the perso...
A basic model is presented for estimating the cost of unmanned lunar and planetary programs. Cost da...
A manpower/cost estimation model is developed which is based on a detailed level of financial analys...
A mass and cost estimating computerized methology for predicting advanced manned space vehicle weigh...
The three main cost areas of unmanned satellite development are discussed. The areas are identified...
NASA is responsible for developing much of the nation's future space technology. Cost estimates for ...
The results are summarized of research accomplished during this period concerning planetary mission ...
An examination was made of early estimates of outer planetary atmospheric probe cost by comparing th...
A collection of scaling equations, weight statements, scaling factors, etc., useful for doing concep...
Cost-estimating relationships for small spacecraft have been shown to be significantly different fro...
The need for a predictive budget/funging model is obvious. The current models used by the Resource A...
The Mars Cost Tracking Model is a computer program that administers a system set up for tracking the...
Preliminary development cost estimate for Apollo project lunar mobile laboratory /Molab
Military and civil space acquisitions have received much criticism for their inability to produce re...
Various methods of cost estimating are described. The method and benefits are presented of industria...
Accurate cost estimation for future work is important for ensuring that organizations have the perso...