The Advanced Photovoltaic Experiment was designed to generate laboratory reference standards as well as to explore the durability of a wide variety of space solar cells. In addition to the cells, it was equipped with an absolute cavity radiometer to measure solar intensity, a spectroradiometer to measure the spectral content of this radiation and a sun angle sensor. Data from the solar cells and various sensors was obtained on a daily basis during the first eleven months of the 69 month flight. In this paper pre-flight and post-flight laboratory measurements are compared with on-orbit calibration data. Pre-flight and post-flight calibration data of the cavity radiometer as well as on-orbit data demonstrated the accuracy and durability of th...
The 1986 solar cell calibration balloon flight was successfully completed on July 15, 1986, meeting ...
The Power Extension Package (PEP) is the prime focus of a development program to produce low cost so...
The 1982 solar cell calibration balloon flight was successfully completed on July 21, meeting all ob...
The Advanced Photovoltaic Experiment (APEX) was designed to generate laboratory reference standards ...
The Advanced Photovoltaic Experiment is a space flight test designed to provide reference cell stand...
The results of post-flight performance testing of the solar cells flown on the Advanced Photovoltaic...
The results of a space flight experiment designed to provide reference cell standards for photovolta...
The objective of the photovoltaic (PV) cell calibration experiment for Pathfinder was to develop an ...
The motivation for advanced solar cell flight experiments is discussed and the Advanced Solar Cell O...
Accurate prediction of the performance of solar arrays in space requires that the cells be tested in...
A brief discussion of the solar cell experiments flown on the Long Duration Exposure Facility (LDEF)...
Photovoltaic cells (solar cells) and other solar array materials were flown in a variety of location...
Design and test data of solar cells selected for flight on ATS-E for radiation effect
Accurate air mass zero (AM0) measurement is essential for the evaluation of new photovoltaic (PV) te...
The 1983 solar cell calibration balloon flight was successfully completed and met all objectives of ...
The 1986 solar cell calibration balloon flight was successfully completed on July 15, 1986, meeting ...
The Power Extension Package (PEP) is the prime focus of a development program to produce low cost so...
The 1982 solar cell calibration balloon flight was successfully completed on July 21, meeting all ob...
The Advanced Photovoltaic Experiment (APEX) was designed to generate laboratory reference standards ...
The Advanced Photovoltaic Experiment is a space flight test designed to provide reference cell stand...
The results of post-flight performance testing of the solar cells flown on the Advanced Photovoltaic...
The results of a space flight experiment designed to provide reference cell standards for photovolta...
The objective of the photovoltaic (PV) cell calibration experiment for Pathfinder was to develop an ...
The motivation for advanced solar cell flight experiments is discussed and the Advanced Solar Cell O...
Accurate prediction of the performance of solar arrays in space requires that the cells be tested in...
A brief discussion of the solar cell experiments flown on the Long Duration Exposure Facility (LDEF)...
Photovoltaic cells (solar cells) and other solar array materials were flown in a variety of location...
Design and test data of solar cells selected for flight on ATS-E for radiation effect
Accurate air mass zero (AM0) measurement is essential for the evaluation of new photovoltaic (PV) te...
The 1983 solar cell calibration balloon flight was successfully completed and met all objectives of ...
The 1986 solar cell calibration balloon flight was successfully completed on July 15, 1986, meeting ...
The Power Extension Package (PEP) is the prime focus of a development program to produce low cost so...
The 1982 solar cell calibration balloon flight was successfully completed on July 21, meeting all ob...