This final report summarizes research performed under NASA contract NCC 2-531 toward generalization of constraint-based scheduling theories and techniques for application to space telescope observation scheduling problems. Our work into theories and techniques for solution of this class of problems has led to the development of the Heuristic Scheduling Testbed System (HSTS), a software system for integrated planning and scheduling. Within HSTS, planning and scheduling are treated as two complementary aspects of the more general process of constructing a feasible set of behaviors of a target system. We have validated the HSTS approach by applying it to the generation of observation schedules for the Hubble Space Telescope. This report summar...
The utility of expert systems techniques for the Hubble Space Telescope (HST) planning and schedulin...
This paper is a consolidated report on ten major planning and scheduling systems that have been deve...
A constraint-based scheduling system called SPIKE is used to create long-term schedules for the Hubb...
This paper describes HSTS (Heuristic Scheduling Testbed System), a software architecture for integra...
The applicability of constraint-based scheduling, a methodology previously developed and validated i...
NASA's Hubble Space Telescope (HST) is a major astronomical facility that was launched in April, 199...
Observations with NASA's Hubble Space Telescope (HST) are scheduled with the assistance of a long-ra...
Progress toward the development of effective, practical solutions to space-based observatory schedul...
Efficient utilization of spacecraft resources is essential, but the accompanying scheduling problems...
In this paper, we summarize current research at Carnegie Mellon University aimed at development of h...
In this paper we describe the use of our planning and scheduling framework, HSTS, to reduce the comp...
In this paper, we discuss issues of problem and model decomposition within the HSTS scheduling frame...
1r COSAT CODES 18. SUBJECT TERMS (Continue on reverse if necessary and identify by block number)J,FI...
With the ever increasing level of automation of astronomical telescopes the benefits and feasibility...
The problem of optimal spacecraft scheduling is both important and difficult. Efficient utilization ...
The utility of expert systems techniques for the Hubble Space Telescope (HST) planning and schedulin...
This paper is a consolidated report on ten major planning and scheduling systems that have been deve...
A constraint-based scheduling system called SPIKE is used to create long-term schedules for the Hubb...
This paper describes HSTS (Heuristic Scheduling Testbed System), a software architecture for integra...
The applicability of constraint-based scheduling, a methodology previously developed and validated i...
NASA's Hubble Space Telescope (HST) is a major astronomical facility that was launched in April, 199...
Observations with NASA's Hubble Space Telescope (HST) are scheduled with the assistance of a long-ra...
Progress toward the development of effective, practical solutions to space-based observatory schedul...
Efficient utilization of spacecraft resources is essential, but the accompanying scheduling problems...
In this paper, we summarize current research at Carnegie Mellon University aimed at development of h...
In this paper we describe the use of our planning and scheduling framework, HSTS, to reduce the comp...
In this paper, we discuss issues of problem and model decomposition within the HSTS scheduling frame...
1r COSAT CODES 18. SUBJECT TERMS (Continue on reverse if necessary and identify by block number)J,FI...
With the ever increasing level of automation of astronomical telescopes the benefits and feasibility...
The problem of optimal spacecraft scheduling is both important and difficult. Efficient utilization ...
The utility of expert systems techniques for the Hubble Space Telescope (HST) planning and schedulin...
This paper is a consolidated report on ten major planning and scheduling systems that have been deve...
A constraint-based scheduling system called SPIKE is used to create long-term schedules for the Hubb...