Object of working out is designing of an individual clearing construction with discontinuum in the way of sewage treatment in servicing deport territory in Zhlobin. The work purpose - to spend an ecological estimation discontinuum a way of sewage treatment. In the course of work researches of quality of sewage treatment, and also possibility of their secondary use are carried out
The results of the landscape-planning research, which has been carriedon the area of former military...
Meshik Oleg Pavlovich; Zubritskaya Tatyana Evgenievna. Features of determining the estimated hydrolo...
Work is dedicated to study complex not stationary processes of the carrying and mélanges of drainage...
In a complex of problems of housing and communal services of one of the major the problem of a choic...
The aim of this work is the reconstruction of the surface treatment of waste water from the territor...
The results of inspection of clearing structures in a settlement of Republic of Bela-rus are submitt...
In the course of work the qualitative and quantitative chemical analysis of sewage of Brest arriving...
Today there is a big need of existing waste disposal plants' reconstruction for the purpose of the r...
Backwash waters which includes iron components is formed in a result of the operation the stations o...
Water-control practices and perspective systems of sewage treatment of washing of motor transport wh...
The results of the analysis of the current status of wastewater treatment Dobrush and determined the...
Radkova A.V.; Pekhota E. A .; Tsykalova I.A. Use of sewage sludge as a component to create an altern...
Today it is impossible to optimize the process of removal of heavy metal ions or manage in conventio...
The geographic location of flotation wastes of the Zletovo and Probistip lead and zinc mines and the...
In the present work the main directions of water desalination technologies improving have been analy...
The results of the landscape-planning research, which has been carriedon the area of former military...
Meshik Oleg Pavlovich; Zubritskaya Tatyana Evgenievna. Features of determining the estimated hydrolo...
Work is dedicated to study complex not stationary processes of the carrying and mélanges of drainage...
In a complex of problems of housing and communal services of one of the major the problem of a choic...
The aim of this work is the reconstruction of the surface treatment of waste water from the territor...
The results of inspection of clearing structures in a settlement of Republic of Bela-rus are submitt...
In the course of work the qualitative and quantitative chemical analysis of sewage of Brest arriving...
Today there is a big need of existing waste disposal plants' reconstruction for the purpose of the r...
Backwash waters which includes iron components is formed in a result of the operation the stations o...
Water-control practices and perspective systems of sewage treatment of washing of motor transport wh...
The results of the analysis of the current status of wastewater treatment Dobrush and determined the...
Radkova A.V.; Pekhota E. A .; Tsykalova I.A. Use of sewage sludge as a component to create an altern...
Today it is impossible to optimize the process of removal of heavy metal ions or manage in conventio...
The geographic location of flotation wastes of the Zletovo and Probistip lead and zinc mines and the...
In the present work the main directions of water desalination technologies improving have been analy...
The results of the landscape-planning research, which has been carriedon the area of former military...
Meshik Oleg Pavlovich; Zubritskaya Tatyana Evgenievna. Features of determining the estimated hydrolo...
Work is dedicated to study complex not stationary processes of the carrying and mélanges of drainage...