An efficient scheduling of bottleneck areas within the semiconductor manufactory gets more and more important. Due to the high complexity within the manufacturing area it is currently not possible to optimize the whole (or even a big part of the) factory at once. So mostly only work center specific optimization approaches are investigated. Typically scheduling problems only deal with two dimensions – jobs and equipment. But in some areas of semiconductor manufactory also a third dimension has to be considered – a limited secondary resource. In this paper a Constraint Programming model for such limited secondary resource problems is presented. Thereby the scheduling model also deals with setup matrices for the first and also secondary resour...
textSemiconductor manufacturing is one of the most complex existing manufacturing systems. It requir...
abstract: The shift in focus of manufacturing systems to high-mix and low-volume production poses a ...
We present a maintenance scheduling problem arising from semi-conductor manufacturing which is chara...
An efficient scheduling of bottleneck areas within the semiconductor manufactory gets more and more ...
abstract: A good production schedule in a semiconductor back-end facility is critical for the on tim...
In this paper we propose a flexible model for scheduling problems, which allows the modeling of syst...
Manufacturing Resources Planning (MRPII) systems are unable to prevent capacity problems occurring o...
[[abstract]]A capacity-constrained scheduling using the concept of the theory of constraints for a s...
This paper develops three mixed integer programming (MIP) models and solution methods to assist in i...
Various factors and constraints should be considered when developing a manufacturing production sche...
The semiconductor manufacturing process usually consists of four main production stages: wafer fabri...
Abstract In recent years, with the advent of robust solvers such as Cplex and Gurobi, constraint pro...
This paper studies the problem of scheduling machines in the photolithography area of a semiconducto...
The capacitated lot-sizing and scheduling problem with sequence-dependent setup time and carryover s...
In this paper, a scheduling heuristic was developed to aid the operators in semiconductor fabs in ch...
textSemiconductor manufacturing is one of the most complex existing manufacturing systems. It requir...
abstract: The shift in focus of manufacturing systems to high-mix and low-volume production poses a ...
We present a maintenance scheduling problem arising from semi-conductor manufacturing which is chara...
An efficient scheduling of bottleneck areas within the semiconductor manufactory gets more and more ...
abstract: A good production schedule in a semiconductor back-end facility is critical for the on tim...
In this paper we propose a flexible model for scheduling problems, which allows the modeling of syst...
Manufacturing Resources Planning (MRPII) systems are unable to prevent capacity problems occurring o...
[[abstract]]A capacity-constrained scheduling using the concept of the theory of constraints for a s...
This paper develops three mixed integer programming (MIP) models and solution methods to assist in i...
Various factors and constraints should be considered when developing a manufacturing production sche...
The semiconductor manufacturing process usually consists of four main production stages: wafer fabri...
Abstract In recent years, with the advent of robust solvers such as Cplex and Gurobi, constraint pro...
This paper studies the problem of scheduling machines in the photolithography area of a semiconducto...
The capacitated lot-sizing and scheduling problem with sequence-dependent setup time and carryover s...
In this paper, a scheduling heuristic was developed to aid the operators in semiconductor fabs in ch...
textSemiconductor manufacturing is one of the most complex existing manufacturing systems. It requir...
abstract: The shift in focus of manufacturing systems to high-mix and low-volume production poses a ...
We present a maintenance scheduling problem arising from semi-conductor manufacturing which is chara...