Master of ScienceDepartment of GeologyBehzad GhanbarianDetermining the effective permeability (keff) of geological formations has broad applications to site remediation, aquifer discharge or recharge, hydrocarbon production, and enhanced oil recovery. However, due to the presence of heterogeneity across scales, accurate calculation of keff requires precise characterization of reservoirs. In the literature, stochastic, theoretical, and numerical methods have been proposed to determine the value of keff. In this study, we propose applications from critical path analysis (CPA), an upscaling technique from statistical physics. More specifically, we postulate that permeability at the mode of permeability probability function should represent the...
Subsurface fluids may travel along paths having a minimum permeabilility greater than the effective ...
The key to increasing reservoir recovery is to provide accurate estimates of the permeable pathways ...
This thesis describes the application of a novel methodology to estimate permeability of clastic roc...
Master of ScienceDepartment of GeologyBehzad GhanbarianDetermining the effective permeability (keff)...
Determining the effective permeability (keff) of geological formations has broad applications to sit...
In this dissertation several unresolved issues related to reservoir characterization and simulation ...
AbstractReservoir characterization, especially during early stages of reservoir life, is very uncert...
This study addresses how reservoir-scale permeability models vary depending on the scale of investig...
In this paper we present new methods to estimate the effective permeability (k_eff) of heterogeneous...
This dissertation is submitted for the degree of Master of Science.Summarization: Properties such as...
Constructing an accurate geological model of the reservoir is a preliminary to make any reliable pre...
The deliverability of a hydrocarbon bearing reservoir is assessed in part by quantifying the reservo...
While burrow-affected permeability must be considered for characterizing reservoir flow, the marked ...
Multiphase flows through reservoir rocks are a universal and complex phenomenon. Relative permeabili...
Current methods of oil and gas field development design rely on reservoir simulation modeling. A res...
Subsurface fluids may travel along paths having a minimum permeabilility greater than the effective ...
The key to increasing reservoir recovery is to provide accurate estimates of the permeable pathways ...
This thesis describes the application of a novel methodology to estimate permeability of clastic roc...
Master of ScienceDepartment of GeologyBehzad GhanbarianDetermining the effective permeability (keff)...
Determining the effective permeability (keff) of geological formations has broad applications to sit...
In this dissertation several unresolved issues related to reservoir characterization and simulation ...
AbstractReservoir characterization, especially during early stages of reservoir life, is very uncert...
This study addresses how reservoir-scale permeability models vary depending on the scale of investig...
In this paper we present new methods to estimate the effective permeability (k_eff) of heterogeneous...
This dissertation is submitted for the degree of Master of Science.Summarization: Properties such as...
Constructing an accurate geological model of the reservoir is a preliminary to make any reliable pre...
The deliverability of a hydrocarbon bearing reservoir is assessed in part by quantifying the reservo...
While burrow-affected permeability must be considered for characterizing reservoir flow, the marked ...
Multiphase flows through reservoir rocks are a universal and complex phenomenon. Relative permeabili...
Current methods of oil and gas field development design rely on reservoir simulation modeling. A res...
Subsurface fluids may travel along paths having a minimum permeabilility greater than the effective ...
The key to increasing reservoir recovery is to provide accurate estimates of the permeable pathways ...
This thesis describes the application of a novel methodology to estimate permeability of clastic roc...