This case study presents relationships between total energy input to plunge pools and scour depth at three BC Hydro dams in British Columbia, Canada. Total energy is defined as the product of stream power and time. The relationship indicates the potential to develop a technique quantifying the rate of scour of rock using the Erodibility Index Method (Annandale 1995; 2006). The scour assessment used the Erodibility Index Method to theoretically quantify scour extent and compare it to observed scour. The Erodibility Index is quantified using in-situ rock parameters including UCS, RQD, joint spacing, aperture, alteration, roughness, and orientation. A graph relating the Erodibility Index and threshold stream power (Annandale 1995) is then us...
Because of the potential risk of undermining foundations, adequate control of scour is an integral p...
Erosional incidents have heightened the necessity of studies regarding rock mass erosion in unlined ...
Laouzas Dam, owned and operated by Electricité de France (EDF), is a 52 m high double-curvature arch...
This paper presents a simplified application of the Comprehensive Scour Model (CSM) developed by Bol...
Following the 2017 events at the Oroville Dam spillways that prompted evacuation of nearly 200,000 d...
The plunge pool performance at four of BC Hydro dam sites is reviewed. The sites of Peace Canyon Dam...
Flood events generating potential risk for dam overtopping may become more frequently in the future,...
Abstract3D BLOCK ERODIBILITY: DYNAMICS OF ROCK-WATER INTERACTIONIN ROCK SCOURbyMichael Freeman Geor...
Thesis (MEng)--Stellenbosch University, 2016.ENGLISH ABSTRACT: Hydraulic structures can release high...
Shahid Abbas pour Dam is located at a distance of about 50 kilometers from Masjed Soleiman and a dis...
The challenge for spillway design over many decades has been to arrive at a design that can discharg...
Among the methods used for evaluating the potential hydraulic erodibility of rock, the most common m...
Many studies investigate erosive processes occurring in non-cohesive granular materials downstream o...
From 2010, a succession of floods in eastern Australia, and particularly in Queensland, brought abou...
Scourof rock is a complex process and can be very problematic for dams when excessive scour threaten...
Because of the potential risk of undermining foundations, adequate control of scour is an integral p...
Erosional incidents have heightened the necessity of studies regarding rock mass erosion in unlined ...
Laouzas Dam, owned and operated by Electricité de France (EDF), is a 52 m high double-curvature arch...
This paper presents a simplified application of the Comprehensive Scour Model (CSM) developed by Bol...
Following the 2017 events at the Oroville Dam spillways that prompted evacuation of nearly 200,000 d...
The plunge pool performance at four of BC Hydro dam sites is reviewed. The sites of Peace Canyon Dam...
Flood events generating potential risk for dam overtopping may become more frequently in the future,...
Abstract3D BLOCK ERODIBILITY: DYNAMICS OF ROCK-WATER INTERACTIONIN ROCK SCOURbyMichael Freeman Geor...
Thesis (MEng)--Stellenbosch University, 2016.ENGLISH ABSTRACT: Hydraulic structures can release high...
Shahid Abbas pour Dam is located at a distance of about 50 kilometers from Masjed Soleiman and a dis...
The challenge for spillway design over many decades has been to arrive at a design that can discharg...
Among the methods used for evaluating the potential hydraulic erodibility of rock, the most common m...
Many studies investigate erosive processes occurring in non-cohesive granular materials downstream o...
From 2010, a succession of floods in eastern Australia, and particularly in Queensland, brought abou...
Scourof rock is a complex process and can be very problematic for dams when excessive scour threaten...
Because of the potential risk of undermining foundations, adequate control of scour is an integral p...
Erosional incidents have heightened the necessity of studies regarding rock mass erosion in unlined ...
Laouzas Dam, owned and operated by Electricité de France (EDF), is a 52 m high double-curvature arch...