Since 1998 an increasing area of tungsten coated tiles has been installed at the central column of ASDEX Upgrade, reaching 7.1 m² in 2001/2002. The tiles were coated commercially by plasma arc deposition to a thickness of 1 μm. Post mortem analysis of the W-coating showed a strong erosion, which is attributed to ion sputtering, due to its two-dimensional variation. During the campaigns with W-coated central column, almost no negative influence on the plasma performance was found. Only during direct plasma wall contact or for reduced clearance in divertor discharges spectroscopic evidence for tungsten influx could be found. Effective sputtering yields of about 10⁻³ were derived, pointing to a strong contribution b...
In ASDEX Upgrade, tungsten is employed as plasma facing material at the central column of the plasma...
ASDEX Upgrade was operated with about 6400 s plasma discharge during the scientific program in 2007/...
Operation with all tungsten plasma facing components has become routine in ASDEX Up-grade. The condi...
Since 1998 an increasing area of tungsten coated tiles has been installed at the central column of A...
At the central column of ASDEX Upgrade, an area of 5.5 m(2) of graphite tiles was replaced by tungst...
In ASDEX Upgrade, the transition from carbon based plasma facing components towards a full tungsten ...
In ASDEX Upgrade tungsten is used as a high-Z plasma facing material. Its erosion, migration and sub...
Currently 85 % of the plasma facing components of ASDEX Upgrade are tungsten coated. Carbon inux fro...
The tungsten programme in ASDEX Upgrade is pursued towards a full high-Z device. The spectroscopic d...
Abstract In ASDEX Upgrade, nearly all plasma facing components (PFC) besides the strike point area o...
Abstract. The material for plasma facing components of a future fusion device is still not decided. ...
In the all W ASDEX Upgrade impurities are injected routinely for radiative cooling. Amongst the diff...
Abstract Operation with all tungsten plasma facing components has become routine in ASDEX Upgrade. T...
In ASDEX Upgrade, tungsten was employed as plasma facing material at the central column heat shield ...
Net erosion and deposition of tungsten (W) in the ASDEX Upgrade divertor were determined after the 2...
In ASDEX Upgrade, tungsten is employed as plasma facing material at the central column of the plasma...
ASDEX Upgrade was operated with about 6400 s plasma discharge during the scientific program in 2007/...
Operation with all tungsten plasma facing components has become routine in ASDEX Up-grade. The condi...
Since 1998 an increasing area of tungsten coated tiles has been installed at the central column of A...
At the central column of ASDEX Upgrade, an area of 5.5 m(2) of graphite tiles was replaced by tungst...
In ASDEX Upgrade, the transition from carbon based plasma facing components towards a full tungsten ...
In ASDEX Upgrade tungsten is used as a high-Z plasma facing material. Its erosion, migration and sub...
Currently 85 % of the plasma facing components of ASDEX Upgrade are tungsten coated. Carbon inux fro...
The tungsten programme in ASDEX Upgrade is pursued towards a full high-Z device. The spectroscopic d...
Abstract In ASDEX Upgrade, nearly all plasma facing components (PFC) besides the strike point area o...
Abstract. The material for plasma facing components of a future fusion device is still not decided. ...
In the all W ASDEX Upgrade impurities are injected routinely for radiative cooling. Amongst the diff...
Abstract Operation with all tungsten plasma facing components has become routine in ASDEX Upgrade. T...
In ASDEX Upgrade, tungsten was employed as plasma facing material at the central column heat shield ...
Net erosion and deposition of tungsten (W) in the ASDEX Upgrade divertor were determined after the 2...
In ASDEX Upgrade, tungsten is employed as plasma facing material at the central column of the plasma...
ASDEX Upgrade was operated with about 6400 s plasma discharge during the scientific program in 2007/...
Operation with all tungsten plasma facing components has become routine in ASDEX Up-grade. The condi...