In the project by the public transport operator of the City of Leipzig (LVB) was elaborated comprehensive summaries of system requirements against software applications and was actually implemented. Exemplary and transferable for use in all public transport companies, the organisation and workflow was supported, based on a integrated Data Model. With that, an integrated and practicable overall solution for the commercial and also the technical and service area, was put into reality for the first time. In parallel to this project the TransTeC Beteiligungs- und Managementgesellschaft mbH of Hanover vouched for the neutrality of the results and with that the possibility for use in further public transport companies. (orig.)SIGLEAvailable from ...
SIGLEAvailable from TIB Hannover: F97B2190+a / FIZ - Fachinformationszzentrum Karlsruhe / TIB - Tech...
SIGLEAvailable from TIB Hannover: F95B2146 / FIZ - Fachinformationszzentrum Karlsruhe / TIB - Techni...
This 'KV-Technologieplattform 2000+' has to enable the realisation of existing knowledge and experie...
For the realisation of transport management systems in conurbations, the introduction of new technol...
For the realisation of transport management systems in conurbations, the introduction of new technol...
The aim of the project was to generate a basis for the future national projects by analysis of EU sp...
The special problems of regional transport are seldom considered in the software-products for operat...
Aufgabe der vorliegenden Forschungsarbeit war es, durch eine verbesserte Einbeziehung des LKW-Verkeh...
Appendix: Protokoll der Verkehrsministerkonferenz, June 10 - 11, 1997, Muenchen (DE). (Auszug zu Tag...
Starting from the description of the present situation of local traffic a concept for a future local...
SIGLEAvailable from TIB Hannover: F93B800 / FIZ - Fachinformationszzentrum Karlsruhe / TIB - Technis...
Available from TIB Hannover: F97B2189+a / FIZ - Fachinformationszzentrum Karlsruhe / TIB - Technisch...
Development of telematic system for public transport control is based on analysis of sustainable dev...
In the course of the joint project 'ISA' in which the participating partners are Verkehrsverbund Rhe...
Copy held by FIZ Karlsruhe; available from UB/TIB Hannover / FIZ - Fachinformationszzentrum Karlsruh...
SIGLEAvailable from TIB Hannover: F97B2190+a / FIZ - Fachinformationszzentrum Karlsruhe / TIB - Tech...
SIGLEAvailable from TIB Hannover: F95B2146 / FIZ - Fachinformationszzentrum Karlsruhe / TIB - Techni...
This 'KV-Technologieplattform 2000+' has to enable the realisation of existing knowledge and experie...
For the realisation of transport management systems in conurbations, the introduction of new technol...
For the realisation of transport management systems in conurbations, the introduction of new technol...
The aim of the project was to generate a basis for the future national projects by analysis of EU sp...
The special problems of regional transport are seldom considered in the software-products for operat...
Aufgabe der vorliegenden Forschungsarbeit war es, durch eine verbesserte Einbeziehung des LKW-Verkeh...
Appendix: Protokoll der Verkehrsministerkonferenz, June 10 - 11, 1997, Muenchen (DE). (Auszug zu Tag...
Starting from the description of the present situation of local traffic a concept for a future local...
SIGLEAvailable from TIB Hannover: F93B800 / FIZ - Fachinformationszzentrum Karlsruhe / TIB - Technis...
Available from TIB Hannover: F97B2189+a / FIZ - Fachinformationszzentrum Karlsruhe / TIB - Technisch...
Development of telematic system for public transport control is based on analysis of sustainable dev...
In the course of the joint project 'ISA' in which the participating partners are Verkehrsverbund Rhe...
Copy held by FIZ Karlsruhe; available from UB/TIB Hannover / FIZ - Fachinformationszzentrum Karlsruh...
SIGLEAvailable from TIB Hannover: F97B2190+a / FIZ - Fachinformationszzentrum Karlsruhe / TIB - Tech...
SIGLEAvailable from TIB Hannover: F95B2146 / FIZ - Fachinformationszzentrum Karlsruhe / TIB - Techni...
This 'KV-Technologieplattform 2000+' has to enable the realisation of existing knowledge and experie...