Topside structures of offshore installations have to support heavy process plant dealing with large volumes of oil and gas under high pressure. Many of these platforms have to be operated in very remote areas in a harsh environment with little supporting infrastructure. It is therefore necessary to design these high risk installations to various types of extreme loadings. One of these extreme scenarios is blast loading from a possible hydrocarbon explosion. Although this is a comparatively low frequency accidental event, it has the capability to cause major fatalities to personnel and serious structural damage which could lead to the complete loss of the platform. At present, most topside structures are designed based on working stress desi...
Structural blast analysis is usually done with two load levels for different design stages; the Stre...
Abstract Offshore installations activities entail the hazard of explosion accidents with potentially...
This paper attempts to rationalise, and assess, the existing design requirement for the sizing of th...
Master's thesis in Structural engineeringToday’s platform design builds on years of experience. Pre...
One of the most dangerous events that can occur on an offshore topside structure is an explosion. If...
The structural analysis of topside module presents many technical challenges that have to be designe...
Master's thesis in Offshore structural EngineeringThe structural analysis of topside module presents...
The Health and Safety Executive (HSE) have a keen interest in the response of Offshore Structures to...
An explosion on a typical offshore installation is a critical, however rare accidental event which m...
Explosion is one of the major hazards that may be encountered by oil and gas industry. In this resea...
Blast walls are provided in offshore structures for protecting critical structural components and pe...
The offshore industry and especially the oil and gas production, has faced a remarkable growth in th...
Master's thesis in Offshore structural engineeringDesign of offshore structures involves a variety o...
The Australian Maritime Engineering Cooperative Research Centre, and its partner organisation initia...
When a high explosive charge detonates in the proximity of an above ground structure, blast waves im...
Structural blast analysis is usually done with two load levels for different design stages; the Stre...
Abstract Offshore installations activities entail the hazard of explosion accidents with potentially...
This paper attempts to rationalise, and assess, the existing design requirement for the sizing of th...
Master's thesis in Structural engineeringToday’s platform design builds on years of experience. Pre...
One of the most dangerous events that can occur on an offshore topside structure is an explosion. If...
The structural analysis of topside module presents many technical challenges that have to be designe...
Master's thesis in Offshore structural EngineeringThe structural analysis of topside module presents...
The Health and Safety Executive (HSE) have a keen interest in the response of Offshore Structures to...
An explosion on a typical offshore installation is a critical, however rare accidental event which m...
Explosion is one of the major hazards that may be encountered by oil and gas industry. In this resea...
Blast walls are provided in offshore structures for protecting critical structural components and pe...
The offshore industry and especially the oil and gas production, has faced a remarkable growth in th...
Master's thesis in Offshore structural engineeringDesign of offshore structures involves a variety o...
The Australian Maritime Engineering Cooperative Research Centre, and its partner organisation initia...
When a high explosive charge detonates in the proximity of an above ground structure, blast waves im...
Structural blast analysis is usually done with two load levels for different design stages; the Stre...
Abstract Offshore installations activities entail the hazard of explosion accidents with potentially...
This paper attempts to rationalise, and assess, the existing design requirement for the sizing of th...