In bridge abutment design, Wisconsin DOT assumes the granular backfill material used behind bridge abutments as free-draining and no hydrostatic pressures are applied on the wall. This research study was undertaken to investigate if backfill materials meet the assumption of a freely-drained condition through a detailed laboratory and field study. Also, the viability of using recycled asphalt pavement (RAP) and shingles (RAS) for granular backfill was investigated. Laboratory testing involved characterizing the materials in terms of gradation/classification, erodibility, permeability, shear strength, volume change (i.e., water induced collapse). Laboratory tests revealed bulking moisture content for natural materials and collapse upon wettin...
Failing to budget an appropriate amount of funding for services rendered during the preconstruction ...
This project has focused on better understanding the potential impact of On-Farm Flood Capture and R...
The bump at the end of the bridge and the high cost of deep embedded drilled shafts have long been r...
This study investigated relationships between field and laboratory moduli in relation to the pavemen...
Design and maintenance of pavement drainage is critical to ensure the long service life of pavements...
Compaction control for subgrade and base materials used in highway construction is typically based o...
Falling weight deflectometer (FWD) and ground penetrating radar (GPR) are nondestructive test device...
This study was designed to test the effects of bio-stabilization on geomaterials as an alternative t...
One of the most common curing methods for conventional concrete is external curing. Surface evaporat...
This thesis is an exploration into the technical and economic issues related to a syngas fermenting ...
Permanent strain and resilient modulus provide direct, quantifiable values that describe two types o...
Premature deterioration of joints in concrete pavements is reportedly a problem in cold weather regi...
Conceptual cost estimating (CCE) is a challenging task for highway agencies due to the limited desig...
This research models the effects of land management practices and policies on overland flow within t...
One of the leading causes of bridge failures within the United States is accidental vehicle collisio...
Failing to budget an appropriate amount of funding for services rendered during the preconstruction ...
This project has focused on better understanding the potential impact of On-Farm Flood Capture and R...
The bump at the end of the bridge and the high cost of deep embedded drilled shafts have long been r...
This study investigated relationships between field and laboratory moduli in relation to the pavemen...
Design and maintenance of pavement drainage is critical to ensure the long service life of pavements...
Compaction control for subgrade and base materials used in highway construction is typically based o...
Falling weight deflectometer (FWD) and ground penetrating radar (GPR) are nondestructive test device...
This study was designed to test the effects of bio-stabilization on geomaterials as an alternative t...
One of the most common curing methods for conventional concrete is external curing. Surface evaporat...
This thesis is an exploration into the technical and economic issues related to a syngas fermenting ...
Permanent strain and resilient modulus provide direct, quantifiable values that describe two types o...
Premature deterioration of joints in concrete pavements is reportedly a problem in cold weather regi...
Conceptual cost estimating (CCE) is a challenging task for highway agencies due to the limited desig...
This research models the effects of land management practices and policies on overland flow within t...
One of the leading causes of bridge failures within the United States is accidental vehicle collisio...
Failing to budget an appropriate amount of funding for services rendered during the preconstruction ...
This project has focused on better understanding the potential impact of On-Farm Flood Capture and R...
The bump at the end of the bridge and the high cost of deep embedded drilled shafts have long been r...