A general approach of designing input-queued multicast switch is to employ multicast switch fabric, where packets can be replicated inside the switch fabric. As compared with unicast switch fabric, the achievable traffic rate region of a switch can be increased, but it is still less than the admissible traffic rate region. In other words, achieving 100% throughput for any admissible multicast traffic pattern is not possible. In this paper, we first revisit the fundamental problems faced by input-queued switch in supporting multicast traffic. We then argue that multicast switch fabric is not necessary if a load-balanced approach is followed. Accordingly, an existing load-balanced two-stage switch architecture [12], consisting of unicast swit...
Input queued (IQ) switches exploiting buffered crossbars (CICQ switches) are widely considered very ...
The feedback-based two-stage switch in [9] elegantly solves the packet mis-sequencing problem withou...
The feedback-based two-stage switch does not require a central scheduler and can provide close to 10...
Proceedings of the IEEE Workshop on High Performance Switching and Routing, 2009, p. 28-33Scalabilit...
The paper studies input-queued packet switches loaded with both unicast and multicast traffic. The p...
Due to its mild requirement on the bandwidth of switching fabric and internal memory, the input-queu...
Due to its mild requirement on the bandwidth of switching fabric and internal memory, the input-queu...
Session - NGNI02: Router Architecture & Switch DesignTwo major challenges in designing high-speed mu...
Abstract—It is known that single-stage IQ based switch can provide 100 % throughput guarantee for an...
Recent studies on switching fabrics mainly focus on the switching schedule algorithms, which aim at ...
This paper deals with multicast flow support in N × N Input Queued switch architectures. A practical...
Thesis (S.M.)--Massachusetts Institute of Technology, Dept. of Electrical Engineering and Computer S...
Abstract — We present a scheme to concurrently schedule unicast and multicast traffic in an input-qu...
In this paper the new packet switch architecture with multiple output queuing (MOQ) is proposed. In ...
In this paper, we address the problem of providing QoS guarantees for multiple input-queued switchin...
Input queued (IQ) switches exploiting buffered crossbars (CICQ switches) are widely considered very ...
The feedback-based two-stage switch in [9] elegantly solves the packet mis-sequencing problem withou...
The feedback-based two-stage switch does not require a central scheduler and can provide close to 10...
Proceedings of the IEEE Workshop on High Performance Switching and Routing, 2009, p. 28-33Scalabilit...
The paper studies input-queued packet switches loaded with both unicast and multicast traffic. The p...
Due to its mild requirement on the bandwidth of switching fabric and internal memory, the input-queu...
Due to its mild requirement on the bandwidth of switching fabric and internal memory, the input-queu...
Session - NGNI02: Router Architecture & Switch DesignTwo major challenges in designing high-speed mu...
Abstract—It is known that single-stage IQ based switch can provide 100 % throughput guarantee for an...
Recent studies on switching fabrics mainly focus on the switching schedule algorithms, which aim at ...
This paper deals with multicast flow support in N × N Input Queued switch architectures. A practical...
Thesis (S.M.)--Massachusetts Institute of Technology, Dept. of Electrical Engineering and Computer S...
Abstract — We present a scheme to concurrently schedule unicast and multicast traffic in an input-qu...
In this paper the new packet switch architecture with multiple output queuing (MOQ) is proposed. In ...
In this paper, we address the problem of providing QoS guarantees for multiple input-queued switchin...
Input queued (IQ) switches exploiting buffered crossbars (CICQ switches) are widely considered very ...
The feedback-based two-stage switch in [9] elegantly solves the packet mis-sequencing problem withou...
The feedback-based two-stage switch does not require a central scheduler and can provide close to 10...